Laserfiche WebLink
<br /> <br />: 29. lInpacl on lnfraattuctur. and Public S.rvlces Will new Or expanded utilities, roads, other infrastructure, or public services be <br />required to serve the project? lOt Yes 0 No <br />If yes, describe the new or additional infrastructure /services needed. (Any infrastructure tha! is. "connutt:d IlCtion" with resp<<J <br />w u", project must be..==I in this EA W; su "EA W Guuu[;1l<$" ft>r ddlzils.J <br /> <br />. <br /> <br />See Attached Response <br /> <br />30. RelatBd Developments; CumulaUve Impacts <br />a. Are future stages of this development planned or likely? 0 Ye. :rJ No <br />- If yes. briefly describe future stages, their timing, and plans for environmental review. <br />b. Is this project a subsequent stage of an earlier project? IZI Yes 0 No. <br />If yes, briefly describe the past development, its timing, and any past environmental review. <br />C. Is other development anticipated on adjacent lands or outlots? EJ Yes 0 No <br />If yes, briefly describe the development and its relationship to the present project. <br />d. If a,b, or c were marked Yes, discuss any cumulative environmental impacts resulting from this project and the other <br />development. <br /> <br />See Attached Response <br /> <br />31. Other POllnUaJ Environmental Impacts If the project may cause any adverse environmental impacts which were not addressed by <br />items 1 to 28, identify and discuss them here, along with any proposed mitigation. <br /> <br />See Attached Response <br /> <br />32. SUMMARY OF ISSUES (This ..dien n=i not be compleWi if the EA W is being dqne for EIS scoping; instmJi, oddress re/rn:znt issues in the <br />. droft Scoping Derision document whic!t must occompony the EA W.) List any impacts and issues identified above that may require <br />further investigation before the project is commenced. Discuss any alternatives or mitigative measures that have been or may <br />be considered for these impacts and issues, including those that have been or may be ordered as permit conditions. <br /> <br />See Attached Response <br /> <br />CERTIFICATIONS BY THE RGU (a1/3 certifications must be signed for EOB acceptance of the E4W for publication of <br />notice in Ihe EOB Monitor) <br /> <br /> <br />A. I hereby certify t document is accurate and complete to the best of my knowledge. <br />Signature <br /> <br />B. I hereby certify that the project described in t s EA W is the complete project and there are no other projects, project stages, or <br />project components, "bed. in this document, which are related. to the project as "'connected actions'" or <br />. "phased action ,a ules. pts. 4410.0200. subp. 9b and subp. 60. <br />Signature <br /> <br />C. I hereby certify t <br />Signature <br /> <br /> <br />being sent to all points on the offidal EQB EA W distribution list. <br /> <br />7/~Y <br /> <br />Date <br /> <br />6 <br /> <br />Minnaou Ez1vironmcnul Quality BOolrd. Revised June 1990. <br />