Laserfiche WebLink
<br /> <br />12: P.hyslcal Impacts on Wator Rosourc.. Will the project involve the physical or hydrologic alteration (dredging, filling, stream div=iion, <br />. outiaIJ structure, diking, impoundment) of any surface water Oake, pond, wetland. stream. drainage ditch)? ~ Yo 0 No <br />If yes, identify the water resource to be affected and describe: the alteration. including the construction process; volumes of <br />dredged or fill material; area affected; length of stream diversion; water surface area affected; timing and extent of fluctuations <br />in water surface elevations; spoils disposal sites; and proposed mitigation measures to minimize impacts. <br /> <br />See Attached Response <br /> <br />. <br /> <br />13. Wal.r Us. <br />a. Will the project involve the installation or abandonment of any wells? il:I Yes 0 No <br />For abandoned wells give the location and Unique well number. For new wells, or other previously unpermitted. wells, give <br />the location and purpose of the well and the Unique well number (if known). <br /> <br />See Attached Response <br /> <br />b. Will the project requlre an appropriation of ground or swface water (including dewatering)? r&:J Yes 0 No <br />If yes, indicate the source, quantity, duration, purpose of the appropriation, and DNR water appropriation permit number of <br />any existing appropriation. Discuss the impact of the appropriation on ground water levels. <br /> <br />C. Will the project requlre connection to a public water supply? I2!l Y.. 0 No <br />If yes, identify the supply, the DNR water appropriation permit number of the supply, and the quantity to be used. <br /> <br />14. Wat.r.roJatod Land U.. Manag.m&nt Districts Does any part of the project site involve a shoreland zoning district,. a delineated 100-year <br />flood plain, or a state or federally designated wild or scenic river land use district? 0 Y.. 01 No <br />If yes, identify the district and discuss the compatibility of the project with the land use restrictions of the district. <br /> <br />. <br /> <br />15. Watsr Surfaes U.. Will the project change the number or type of watercraft on any water body? 0 Yes al: No <br />If yes, indicate the current and projected watercraft usage and discuss any potential overcrowding or conflicts with other users <br />or fish and wildlife resources. <br /> <br />16. Salls Approximate depth (in feet) to: <br />Ground water: minimum 10 1? average 1 R ?4 Bedrock: mmmmm nnlrn.7n average <br />Describe the soils on the site, giving SCS classifications, if known. (SCS interpretations and soil boring logs need not be attached.) <br /> <br />See Attached ReSfX.>llS,," <br /> <br />17. Erosion and S.dlmentation Give the acreage to be graded or excavated and the cubic yards of soil to be moved: <br />acres 90 ; cubic yards 480,000 <br />Describe any steep slopes or highly erodible soils and identify them on the site map. <br />Describe the erosion and sedimentation measures to be used during and after construction of the project. <br /> <br />See Attached Response <br /> <br />. <br /> <br />3 <br />