Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />RESPONSE TO REQUEST FOR <br />PROPOSAL (CONTINUED) <br /> <br />G.3) General Conditions <br /> <br />Project General Conditions costs are <br />affected primarily be the size and length <br />of the project. These costs will be issued <br />as small bid packages. <br /> <br />$155,800 <br />67,500 <br />12,900 <br />19,500 <br />8,600 <br />4,700 <br />7,400 <br />3,800 <br />2,500 <br />3,400 <br />2,900 <br />4,000 <br />16,300 <br />28,500 <br />6.300 <br />$344,100 <br /> <br />Supervision <br />Project Management <br />Safety Director <br />Trucking <br />Temporary Utilities <br />Temporary Sanitation <br />Construction Dumpsters <br />Site Office <br />Printing, Postage, Delivery <br />Temporary Controls <br />Telephone and Fax <br />Site Fence <br />Consumables and Equipment <br />General Clean-Up <br />Safetv <br />TOTAL <br /> <br />G.4) Builders Risk <br />Based on a $9,000,000 value, a 12 <br />month schedule and typical community <br />center construction systems, we can <br />provide Builders Risk premium for an <br />estimated cost of $9,800. <br /> <br />G.5) Performance Bond <br />Based on a project described for <br />Builders Risk, RJM Construction can <br />provide Performance and Payment <br />Bonds for an estimated cost of $63.200. <br /> <br />G.6) Equipment Rental Rates <br /> <br />There will be very little equipment required <br />for this project as the contractors will <br />include in the cost of the work. However, <br />should it be necessary for RJM to provide <br /> <br /> <br />El.K RIVER COMMUNITY YMCA I ~ I Is <br />