Laserfiche WebLink
<br />.3 Subtract lbe aggregate of previous payments made by lbe Owner. <br /> <br />If lbe aggregate of previous payments made by lbe Owner exceeds lbe amount due lbe Construction Manager, lbe <br />Construction Manager shall reimburse lbe difference to lbe Owner. <br /> <br />~ 7.2.3 The Owner's accountants will review and report in writing on lbe Construction Manager's final accounting <br />within 30 days after delivery oflbe fmal accounting to lbe Architect by the Construction Manager. Based upon such <br />Cost of lbe Work as lbe Owner's accountants report to be substantiated by lbe Construction Manager's final <br />accounting, and provided lbe olber conditions of Section 7.2.1 have been met, the Architect will, wilbin seven days <br />after receipt of the written report of the Owner's accountants, either issue to the Owner a final Certificate for <br />Payment with a copy to lbe Construction Manager or notify lbe Construction Manager and Owner in writing of the <br />Architect's reasons for withholding a certificate as provided in Section 9.5.1 of AZO 1""--1 997 . The time periods <br />stated in this Section 7.2 supersede lbose stated in Section 9.4.1 of A201nL1997. <br /> <br />~ 7.2.4 If lbe Owner's accountants report lbe Cost of lbe Work as substantiated by lbe Construction Manager's final <br />accounting to be less lban claimed by lbe Construction Manager, lbe Construction Manager shall be entitled to <br />proceed in accordance with Article 9 without a further decision oflbe Architect. Unless agreed to olberwise, a <br />demand for mediation or arbitration oflbe disputed amount shall be made by the Construction Manager within 60 <br />days after lbe Construction Manager's receipt of a copy oflbe Architect's fmal Certificate for Payment. Failure to <br />make such demand within this 60-day period shall result in lbe substantiated amount reported by lbe Owner's <br />accountants becoming binding on lbe Construction Manager. Pending a fmal resolution of the disputed amount, lbe <br />Owner shall pay the Construction Manager lbe amount certified in lbe Architect's final Certificate for Payment. <br /> <br />~ 7,2.5 If, subsequent to final payment and at lbe Owner's request, lbe Construction Manager incurs costs described <br />in Section 6.1 and not excluded by Section 6.2 (I) to correct nonconforming Work or (2) arising from the resolution <br />of disputes, the Owner shall reimburse lbe Construction Manager such costs and lbe Construction Manager's Fee, if <br />any, related lbereto on lbe same basis as if such costs had been incurred prior to final payment, but not in excess of <br />the Guaranteed Maximum Price. If lbe Construction Manager has participated in savings, lbe amount of such <br />savings shall be recalculated and appropriate credit given to lbe Owner in determining lbe net amount to be paid by <br />lbe Owner to lbe Construction Manager. <br /> <br />ARTICLE 8 INSURANCE AND BONDS <br />~ 8.1 INSURANCE REQUIRED OF THE CONSTRUCTION MANAGER <br />During bolb phases oflbe Project, lbe Construction Manager shall purchase and maintain insurance as set forth in <br />Section ILl of A201nL1997. Such insurance shall be written for not less lban lbe following limits, or greater if <br />required by law;- In addition to Owner all Prime Contractors fA shall Ii:,>! Construction Mana1?er 3R an additional <br />in:'\ured__0'!l_~..p!"j.I.'l1~rx.l nOll..:..OO...utributQrvllasis to the Prime Contractor's g~!1eral auto....and excess liahilitv nolicies <br />for both ommimr and conmleted onerations. <br /> <br />~ 8.1.1 Workers' Compensation and Employers' Liability meeting statutory limits mandated by state and federal <br />laws. If(l) limits in excess oflbose required by statute are to be provided, or (2) lbe employer is not statutorily <br />bound to obtain such insurance coverage or (3) additional coverages are required, additional coverages and limits for <br />such insurance shall be as follows: <br /> <br />As shown on Exhibit A C:erti:t15~_"!~~_ 9,fJ!!~,~ance <br /> <br />~ 8.1.2 Commercial General Liability including coverage for Premises-Operations, Independent Contractors' <br />Protective, Products-Completed Operations, Contractual Liability, Personal Injury and Broad Form Property <br />Damage coverage for Explosion, Collapse and Underground hazards): <br />Each Occurrence <br />General Aggregate <br />Personal and Advertising Injury <br />Products-Completed Operations Aggregate <br /> <br />.1 The policy shall be endorsed to have lbe General Aggregate apply to lbis Project only. <br />.2 Products and Completed Operations insurance shall be maintained for a minimum period of at least <br />( ) year(s) after either 90 days following Substantial Completion or fmal payment, whichever <br />is earlier. <br />