Laserfiche WebLink
<br />this dQ.U~rJi:mit.does not annlv to General Conditions wor~ .9!J9__work w,ith resnect to which_th..~.".G.9J).struGliQn <br />MaJl~Jl"r..sllbmits a bida!!lLisJhe aualified low bidder <br /> <br />96.1.2 LABOR COSTS <br />.1 Wages of construction workers directly employed by the Construction Manager to perform the <br />constrnction of the Work at the site or, with the Owner's agreement, at off-site workshops. <br />.2 Wages or salaries of the Construction Manager's supervisory and administrative personnel when <br />stationed at the site with the Owner's agreement-;- and necessID__!9,..~alTV out._the Work directly hv <br />Constmction Manag"r,Rll!~~nt to 66,1.2. I, <br /> <br />Classification <br /> <br />Name <br /> <br />(IJ it is intended that the wages or salaries oj certain personnel stationed at the Construction <br />Manager's principal office or offices other than the site office shall be included in the Cost oj the <br />Work, such personnel shall be identified below) <br />.3 Wages and salaries of the Construction Manager's supervisory or administrative personnel engaged, <br />at factories, workshops or on the road, in expediting the production or transportation of materials or <br />equipment required for the Work, but only for that portion of their time required for the W orkdirectly <br />performed bv Construction ManaQer. <br />.4 Costs paid or incurred by the Construction Manager for taxes, insurance, contributions, assessments <br />and benefits required by law or collective bargaining agreements, and, for personnel not covered by <br />such agreements, customary benefits such as sick leave, medical and health benefits, holidays, <br />vacations and pensions, provided that such costs are based on wages and salaries included in the Cost <br />of the Work under Sections 6.1.2,1 through 6.1.2,3, <br /> <br />9 6.1.3 PRIME CONTRACT COSTS <br />Payments made by the Construction Manager to Prime Contructors in accordance with the requirements of the <br />Contracts for the Work. <br /> <br />96.1.4 COSTS OF MATERIALS AND EQUIPMENT INCORPORATED IN THE COMPLETED CONSTRUCTION <br />.1 Costs, including transportation, of materials and equipment incorporated or to be incorporated in the <br />completed construction. <br />.2 Costs of materials described in the preceding Section 6,1.4,1 in excess of those actually installed but <br />required to provide reasonable allowance for waste and for spoilage. Unused excess materials, if any, <br />shall be handed over to the Owner at the completion of the Work or, at the Owner's option, shall be <br />sold by the Construction Manager; amounts realized, if any, from such sales shall be credited to the <br />Owner as a deduction from the Cost of the Work. <br /> <br />96.1.5 COSTS OF OTHER MATERIALS AND EQUIPMENT, TEMPORARY FACILITIES AND RELATED ITEMS <br />.1 Costs, including transportation, installation, maintenance, dismantling and removal of materials, <br />supplies, temporary facilities, machinery, equipment, and hand tools not customarily owned by the <br />constrnction workers, which are provided by the Construction Manager at the site and fully consumed <br />in the performance ofthe Work; and cost less salvage value on such items if not fully consumed, <br />whether sold to others or retained by the Construction Manager. Cost for items previously used by the <br />Constrnction Manager shall mean fair market value. <br />.2 Rental charges for temporary facilities, machinery, equipment and hand tools not customarily owned <br />by the constrnction workers, which are provided by the Construction Manager at the site, whether <br />rented from the Construction Manager or others, and costs of transportation, installation, minor <br />repairs and replacements, dismantling and removal thereof. Rates and quantities of equipment rented <br />shall be subject to the Owner's prior approvaL <br />.3 Costs of removal of debris from the site, <br />.4 Reproduction costs, costs oftelegrarns, facsimile transmissions and long-distance telephone calls, <br />postage and express delivery charges, tel<:phone at the site and reasonable petty cash expenses of the <br />site office. <br />.5 That portion of the reasonable travel and subsistence expenses of the Construction Manager's <br />personnel incurred while traveling in discharge of duties connected with the Work. <br /> <br />96.1.6 MISCELLANEOUS COSTS <br />.1 That portion directly attributable to this Contract of premiums for insurance and bonds. <br />