My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.4. SR 05-21-2007
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2007
>
05/21/2007
>
5.4. SR 05-21-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:36:55 AM
Creation date
5/18/2007 2:36:00 PM
Metadata
Fields
Template:
City Government
type
SR
date
5/21/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />3.18 Paragraph; Delete paragraph in its entirety (see our changes to Article II, Paragraph 11.6 <br />of these Supplementary General Conditions). <br /> <br />4.1.3 Subparagraph; Line I; After "terminated, the," delete the balance of the Subparagraph <br />and add: <br /> <br />Owner may at any time employ or retain a licensed architect to perform all or <br />any part of the duties respectively of the Architect hereunder or to exercise <br />any of its rights hereunder. Owner shall notify all parties in writing (setting <br />forth the scope of said replacement Architect's duties and responsibilities) <br />prior to making this change. <br /> <br />4.2.1 Subparagraph; Beginning in Line 2; After "Documents" delete the balance of the first <br />sentence ofthis Subparagraph. <br /> <br />4.2.2 Subparagraph; Line 2; After "operation" add "and the status of the Project"; and after <br />"become" delete "generally"; Beginning in Line and into Line 4; After "Work" delete <br />"completed"; Beginning in Line 5; Before "if' delete "in general"; and after "is" delete <br />the balance of the first sentence and add "proceeding in accordance with the Contract <br />Documents."; Beginning in Line 6; Delete the second sentence of this Subparagraph in its <br />entirety; Beginning in Line 9; Delete "the construction means, methods, techniques, <br />sequences or procedures, or for"; and beginning in Line 10; After "Work" insert a period <br />"." and delete the balance of the Subparagraph and add: <br /> <br />The Architect shall be responsible for promptly notifying the Owner of the <br />failure of Contractor, Subcontractor, or any other person performing any of <br />the Work, in failing to use proper construction means, methods, techniques, <br />sequences, procedures, safety precautions and programs but only to the extent <br />Architect become aware of, or should, exercising due professional diligence, <br />be aware of same. The Architect shall also promptly notify Owner in writing <br />of the failure of any of the foregoing parties to carry out the Work in <br />accordance with the Contract Documents. The number of inspections <br />required by the Architect may be further clarified in writing by the Owner and <br />Architect. " <br /> <br />4.2.4 Subparagraph; Line 3; After "authorized" add "by the Owner"; Line 4; After "contract" <br />add: <br /> <br />provided, however, that Owner may instruct, correspond or negotiate with <br />Contractor directly and in such event shall forward a copy of any writing to <br />the Architect and shall advise the Architect of any significant instruction, <br />correspondence, or negotiation and shall afford the Architect an opportunity to <br />attend any formal discussions directly between Owner and Contractor, if <br />appropriate. <br /> <br />311340v 1 JMS EL185-6 <br /> <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.