Laserfiche WebLink
<br /> <br />Task 4 - Conceptual Parking Layouts. Concept designs for parking facilities will be <br />developed. The concept designs will depict the parking structure footprint and <br />relationship to the site, number of parking bays, space layout, circulation, ramping, <br />elevators and stairs, entry/exit locations, parking control equipment, accessible spaces, <br />and commercial space (if applicable). <br /> <br />Task 5 - Final Designs and Cost Estimate. Review the plans with you via telephone and <br />discuss any modifications to be incorporated into final concept designs. Provide <br />conceptual cost estimates for each design. <br /> <br />Task 6 - Interim Report. An interim report will be prepared outlining the Phase 2 tasks <br />above. <br /> <br />Phase 3 - Final Recort and Presentation of Study Findinas <br /> <br />Task 1 - Draft Final Report. A draft final report will be prepared covering Phases 1 and 2. <br />A meeting will then be held with city staff to discuss findings and recommendations in <br />the report. <br /> <br />Task 2 - Final Report. A final report will be prepared detailing the supply/demand <br />findings, parking management recommendations, and alternatives analysis. Issues <br />discussed in the review meeting will be incorporated into the final report. Copies of the <br />report will be issued to the city. <br /> <br />Task 3- Final Presentation. Prepare a summary presentation of the findings of the study. <br />Make one final presentation and discuss the findings. <br /> <br />