Laserfiche WebLink
<br />the award for the portion of the Facilities taken. To the extent permissible under the Bond Resolution and <br />with an Opinion of Counsel by Bond Counsel that such action would not impair the tax-exempt status of <br />the Bonds, Lessor shall apply its share of any award for partial taking of the Facilities to partially redeem <br />or defease the Bonds, Prior to the Maturity Date, there shall be no credit or adjustment in Basic Rent or <br />Additional Rent because of any partial condemnation, except to the extent that debt service on the Bonds <br />is reduced by partial redemption or defeasance, From and after the Maturity Date, Basic Rent and <br />Additional Rent shall be reduced in proportion to the reduction in the estimated market value of the <br />Project. <br /> <br />Section 8.04. Substantiallv All. Substantially all of the Building shall be deemed to have been <br />taken if Lessee, in its sole discretion, determines that following the taking, it is not financially or <br />operationally feasible to continue providing its programs and services in the Building, <br /> <br />ARTICLE IX <br /> <br />EQUIPMENT <br /> <br />Section 9.01. Installation of Equipment. Lessee may, from time to time in its discretion and at its <br />own cost and expense, install or place Lessee Equipment and other tangible personal property in the <br />Building and (with prior written consent of Lessor) outside the Building on the Land, Lessor, at the <br />direction of Lessee, will install the Equipment in the Building, Only the Equipment in the Building is <br />subject to Lessor's rights under this Lease, and Lessee Equipment, unless it replaces Equipment, is not <br />subject to Lessor's rights under this Lease, In the event that a lessor, vendor or purchase money lender <br />(other than Lessor) installs any Lessee Equipment in the Building, Lessee shall cause any damage <br />resulting to the Project therefrom to be repaired and the Project to be restored to its previous condition. <br /> <br />Section 9.02, Removal of Equipment. If no default by Lessee exists under this Lease, Lessee <br />shall have the right to remove Equipment from the Project and have the Equipment released from the <br />terms of this Lease as follows: <br /> <br />(a) Subject to the terms and conditions of Section 4.06(b) hereof, Lessee shall have the <br />privilege from time to time, and at its own cost, in the ordinary courSe of business of substituting <br />equipment and related property for any Equipment constituting a part of the Project, provided that such <br />substitution shall not impair the value, character, utility or revenue producing significance of the Project <br />or change the nature of the equipment substituted, Any such substituted or replacement property, <br />including Lessee Equipment, shall become Equipment subject to the terms of this Lease in place of the <br />replaced equipment until the Maturity Date, at which time the same shall become or again be Lessee <br />Equipment. <br /> <br />(b) Lessee shall also have the privilege in the ordinary course of business of removing any <br />Equipment from the Building prior to the Maturity Date without substitution therefor if the same is <br />obsolete and no longer used or useful in the operation of the Project; provided that Lessee pays a sum <br />equal to the then value of said Equipment as determined by an Independent Engineer selected by Lessee. <br />Lessee shall pay such amounts to Lessor for deposit in the Bond Fund established pursuant to the Bond <br /> <br />23 <br />