My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.3. SR 08-01-1994
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1994
>
08/01/1994
>
7.3. SR 08-01-1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:36:51 AM
Creation date
4/19/2007 9:03:10 AM
Metadata
Fields
Template:
City Government
type
SR
date
8/1/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I ~"-( <br />( i/ <br />III< River <br /> <br />. <br /> <br />. <br /> <br /> <br /> <br />MEMORANDUM <br /> <br />TO: <br /> <br />MAYOR & CITY COUNCIL <br /> <br />FROM: <br /> <br />PAT KLAERS, CITY ADMINISTRATOR <br /> <br />DATE: <br /> <br />JULY 28, 1994 <br /> <br />SUBJECT: HILLSIDE 4TH PLAT <br /> <br />Consideration of the Hillside Estates 4th Addition was continued due mainly <br />to concerns over the trails. A special Park and Recreation Commission <br />meeting was held on 7/26/94 on this topic and these draft minutes are <br />attached for your review. <br /> <br />Staff concurs with all the recommendations from the Commission with the <br />exception of one item. We agree with the NSPIUPA and gas easement <br />discussions, and with the water tower park site. The one area of concern <br />relates to pedestrian movement routes from 193rd Avenue in a northeast <br />fashion to 197th Avenue (Auburn route). <br /> <br />Regarding this pedestrian movement issue, the Commission looked at: <br /> <br />. The original proposal with the trail behind lots <br />. No trail or sidewalk with the standard 32 foot wide street and 60 <br />foot right of way <br />. A 6 foot concrete sidewalk and a standard street and right of way <br />. A 6 foot concrete sidewalk and an extra 10 feet of bituminous in the <br />street for a 42 foot wide street and a 70 foot right of way. <br /> <br />The Council should be aware that there are other options that exist for this <br />Auburn pedestrian route. One of the options includes a mix between the <br />Park and Recreation Commission recommendation of an extra 10 feet of <br />bituminous surface and right of way, and the standard street with a concrete <br />sidewalk. <br /> <br />Issues in reviewing this item include: residential pedestrian (bicycle, roller <br />blade, walking) movements; area-wide pedestrian movements and trial plan; <br />193rd and 197th east/west pedestrian routes; the Hillside 3rd plat that has <br />been approved; and the existing stub-ins of utilities in the 4th Addition. <br /> <br />It is appropriate for the Council to consider a hybrid of options. The Council <br />could consider a 6 foot wide concrete sidewalk, a 36 foot wide street within a <br /> <br />P.O. Box 490 · 13065 Orono Parkway · Elk River, MN 55330 · (612) 441-7420 · Fax: (6l2) 44l-7425 <br />
The URL can be used to link to this page
Your browser does not support the video tag.