Laserfiche WebLink
<br />. MS,- <br />July 20, 1994 <br />CONSULTING ENGINEERS File: 230-227-11 <br /> <br />CiVil ENGINEERING: <br /> <br />fNVl!ONMENIAI <br /> <br />J.1UNJCIPAl <br /> <br />PlANNJNG <br /> <br />STRUCTURAl <br /> <br />. SURVEYING <br /> <br />TRAFFIC <br /> <br />TRAN$,POHATJON <br /> <br />1326 Energy Pork Drive <br /> <br />SI. Paul, MN 55108 <br />612-644-4389 <br />fax: 612-644-9446 <br /> <br />. 9800 Shelard Parkway <br />Minneapalis, MN 55441 <br />612-546-0432 <br />fax: 612-544-6398 <br /> <br />ITEM 6.2. <br /> <br />Honorable Mayor and City Council <br />City of Elk River <br />13065 Orono Parkway <br />P.O. Box 490 <br />Elk River, MN 55330 <br /> <br />RE: HILLSIDE ESTATES 3RD ADDITION FEASIBILITY STUDY <br /> <br />Dear Council Members: <br /> <br />The City has received a petition from Phoenix Enterprises signed by Mr. Richard Foster, <br />regarding the extension of storm sewer and streets to serve the Hillside Estates 3rd Addition. <br />As you may be aware, this area has previously had sanitary sewer and watermain extended <br />through it in the project which connected the new elevated water tower to the existing City <br />water system. This project was just completed in the spring of 1994. The Hillside Estates <br />3rd Addition is the final piece of the preliminary plat of Hillside Estates which included the <br />commercial property and the 1st and 2nd Additions. Attached is a copy of the petition <br />received from Mr. Foster. <br /> <br />We have prepared the attached resolution which declares the adequacy of the petition and <br />orders the feasibility study for the improvements in Hillside Estates 3rd Addition. <br />Mr. Foster also requests that the City authorize the preparation of plans and specifications. <br />As has been done in the past, we would recommend that, by City Council consensus, <br />direction is given to prepare plans and specifications contingent upon an appropriately sized <br />escrow account being established by Mr. Foster to cover the cost of such improvements. At <br />a future meeting, a resolution approving the plans and specifications and ordering the project <br />would be presented to the City Council. <br /> <br />If you have any questions regarding this project, I will be in attendance at your July 25, <br />1994, City Council meeting. <br /> <br />Sincerely, <br /> <br />MSA, CONSULTING ENGINEERS <br /> <br />.~!d~ <br /> <br />Terry J. Maurer, P.E. <br /> <br />TJM:tw <br />Attachments <br /> <br />227-20] Ljul <br />