Laserfiche WebLink
<br />. <br /> <br />EXPENSES: <br />SALARIES: <br /> <br />BENEFITS: <br /> <br />REPAIRS <br />& MTCE. <br /> <br />UTILITIES: <br /> <br />REVISED PROPOSAL BY SUB-COMMITTEE <br /> <br />The salary amount we felt was to high but decided to leave it as is. <br />The present Arena Manager salary is $30,160, part time Ice crew is about S11,ooo and concession <br />workers are about S5600 for the past 1993-94 season. the 600 At present we have one full time Arena <br />Manager with one half time employee during the skating season and other part time ice crew and <br />concession workers. <br /> <br />The benefits we felt were high but if the City 1 ED A takes over Operations of the Arenas this would <br />be the same as the rest of the city employees. At present the Arena Manager receives a S 1000 IRA <br />annually and paid medical Blue Cross Blue Shield insurance coverage S17OO. The Arena Manager <br />also receives mileage at a rate ofS.25 cents per mile which came to about S450 in 1993-94. <br /> <br />The 1994 shows the actual Repairs and Maintenance cost of S14,5OO. We felt there numbers were <br />on the high side but the present rink is getting older and additional maintenance will probably be needed. <br />Some of the expenses could be reduced by using city staff when needed for special projects. And to be <br />able to use city owned equipment instead of renting it. <br /> <br />The utilities we felt were very high. The total for 1993-94 was S33,500. The biggest expense for the <br />utility group is the Electric at about S23,000 a year. Gas at S7000, Telephone at S1800 and sanitation <br />at Sl,100. <br />The new building will be bigger and a larger ice sheet but with newer technology should be more efficient <br />also. The Elk River Municipil Utilities Commision has given this project an Economic Development Rate <br />for a 5 year term. The estimate for tripling the electric usage with the special rate would put the cost at <br />about S63,000 for the 1995-% season. Doubling these other expense the total would be about S82,000. <br />So we feel a conservative estimate of S9O,000 is justified. <br /> <br />. INSURANCE: There is a new Insurance Company that strictly insures Ice Arenas and the estimate we <br />received from them was S20,000. 1993-94 insurance totaled S13,OOO which includes <br />Property S2560, Liability S3400 + Open Skate S155 + RollerlJlading S250+Dance & Circus S130, <br />Employee Dishonesty S110, Crime S150, Boiler S1600, Worker Compensation $3200, Accident <br />& Medical S900. <br /> <br />ZAMBONI: Zamboni Maintenance and Fuel for 1993-94 totaled $2404. We felt the maintenance was a little on the <br />high side seeing that in the 3 previous years we did not total $7,000. But recognizing that the Zamboni <br />is aging that an increase to S5000 in 1995-96 should be adequate. <br /> <br />DRY FLOOR Left as is. One expense that may need be added in or else use a fund-raiser eventCs) would be the cost <br />EVENTS: of the carpet for indoor soccer. <br /> <br />EXISTING <br />ARENA <br />DEBT: <br /> <br />PAYMENT <br />OF PARTIAL <br />SALARIES: <br /> <br />In October of 1994 the debt on the existing arena will need to be refinanced. The balance at that <br />time will be approximately $33,000. The debt is held by three banks, First National Bank of Elk <br />River, Bank of Elk River and State Bank of Rogers. The payment is $2,500 principle plus interest <br />which is based on one percentage above the T-Bill rate, not less than 8% and not more than 10"/0. <br />The numbers are shown based on an 8% rate. <br /> <br />There is a request by the committee members to offset some of the Salaries by payment from <br />the City (park fees) or Park and Recreation Board for improvements. This may only be needed for the <br />first three years or so depending on the bond structure. <br /> <br />. <br /> <br />Revision Date: 7/21194,revfeas2,dpm <br /> <br />3 <br />