Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />:=r;:t,-- ~" <br />\~r'~J>O> S~erfjurne County <br />~~, %gliway 'Department <br /> <br />. , <br /> <br />JON II l!!ll <br /> <br /> <br />LJ <br /> <br />P.O. BOX 338. ELK RIVER, MN 55330 . PHONE (612)441.1722 . FAX (612)441.2264 <br /> <br />6/9/94 <br /> <br />Steven Ach, City Planner <br />P.O. Box 490 <br />13065 Orono Parkway <br />Elk River, MN 55330 <br /> <br />Dear Mr. Ach: <br /> <br />I have a concern regarding the above mentioned preliminary plat. The alignment of Lander Street <br />NW creates an intersection access that would conflict with the south access of Macon St. NW <br />only 300' west. The current arrangement would cause confusion and possible accidents for <br />motorists. We would not grant an access to CSAH 30 at this time. <br /> <br />An acceptable access directly across from the existing south access of Macon St. NW is <br />recommended. We would also require that a right turn lane be constructed to our standards when <br />the access is constructed. Also, the stop sign must be installed before the access is usable. <br /> <br />The letter is only commenting on the preliminary plat and does not preclude any other <br />requirements. An access peI1I1it must be obtained from the County Engineer prior to any <br />construction of a an access to a county highway. <br /> <br />kr:;~ <br /> <br />Dave Schwarting, P.E. <br />County Engineer <br /> <br />