My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.5. SR 07-18-1994
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1994
>
07/18/1994
>
7.5. SR 07-18-1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:36:50 AM
Creation date
4/13/2007 1:27:17 PM
Metadata
Fields
Template:
City Government
type
SR
date
7/18/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />Mr. Steve Ach <br />June 15, 1994 <br />Page Three <br /> <br />C. Utility Plan <br /> <br />1. The City is in the process of preparing plans and specifications for the <br />extension of trunk sanitary sewer and water westerly along the Orono <br />Parkway alignment. As part of that plan preparation, an analysis will be done <br />of the elevations of the sewer necessary to serve the Country Crossings 2nd <br />Addition. <br /> <br />2. Consideration needs to be given to looping the watermain on the I8lst Lane <br />cul-de-sac. A loop could be provided over to Joplin Street with a north-south <br />extension of watermain along Joplin Street. <br /> <br />If you have any questions regarding these comments, please call. <br /> <br />Sincerely, <br /> <br />MSA, CONSULTING ENGINEERS <br /> <br />. <br /> <br />~~~ <br /> <br />Terry J. Maurer, P.E. <br /> <br />TJM:tw <br /> <br />. <br /> <br />2301232-1509.jun <br />
The URL can be used to link to this page
Your browser does not support the video tag.