Laserfiche WebLink
<br />. <br /> <br />Mr. Steve Ach <br />June 15, 1994 <br />Page Three <br /> <br />C. Utility Plan <br /> <br />1. The City is in the process of preparing plans and specifications for the <br />extension of trunk sanitary sewer and water westerly along the Orono <br />Parkway alignment. As part of that plan preparation, an analysis will be done <br />of the elevations of the sewer necessary to serve the Country Crossings 2nd <br />Addition. <br /> <br />2. Consideration needs to be given to looping the watermain on the I8lst Lane <br />cul-de-sac. A loop could be provided over to Joplin Street with a north-south <br />extension of watermain along Joplin Street. <br /> <br />If you have any questions regarding these comments, please call. <br /> <br />Sincerely, <br /> <br />MSA, CONSULTING ENGINEERS <br /> <br />. <br /> <br />~~~ <br /> <br />Terry J. Maurer, P.E. <br /> <br />TJM:tw <br /> <br />. <br /> <br />2301232-1509.jun <br />