Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />Solid Rock Church <br />May 24, 1994 <br /> <br />Page 4 <br /> <br />--.----------------------- <br /> <br />TRAFFI C <br /> <br />The majority of the traffic generated by such a use would be between the <br />hours of 7:30 - 8 a,m, and 3:30 - 4 p.rn, Most students will be using the bus <br />services provided by the school district, however, it is anticipated that some <br />high school students will drive to school and others will be dropped off and <br />picked up by parents, <br /> <br />Traffic concerns have been a major issue of the surrounding residents and the <br />city since the church was built in 1984. The attached minutes from previous <br />meetings reflect this concern, There is no doubt that the addition of a 250, <br />300 student school will generate additional traffic to this area. However, <br />staff is unsure at this time what the traffic impacts will be. Staff has <br />discussed the traffic issue with City Engineer Terry Maurer. It was the <br />consensus of the City Engineer and staff that a traffic study should be <br />conducted by the applicant so that traffic issues can be thoroughly <br />researched, Therefore, staff would recommend that this item be continued <br />until the June 28, 1994, Planning Commission meeting, which should give <br />the applicant enough time to complete the traffic study, <br /> <br />RECOMMENDATION <br /> <br />It is recommended the Planning Commission continue this item until the <br />June 28, 1994, Planning Commission meeting allowing the applicant time to <br />provide staff with a traffic study addressing the potential impacts of the <br />proposed schooL <br /> <br />solid.pc <br />