My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.2. SR 04-16-2007
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2007
>
04/16/2007
>
5.2. SR 04-16-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:36:50 AM
Creation date
4/13/2007 10:32:27 AM
Metadata
Fields
Template:
City Government
type
SR
date
4/16/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />e. Payment of a fine to cover administrative and remediation costs; and <br /> <br />f. The implementation of source control or treatment BMFs. <br /> <br />(b) Such notice shall also advise the property owner of the right to request a hearing before <br />the city administrator or designee to contest the contents of the notice. <br />(c) If requested by the person upon whom the notice is served under subsection (a) of this <br />section, a hearing before the city administrator or designee shall be held at which the person <br />may contest the contents of the notice. The request for such a hearing must be made within <br />five days after receipt of the notice provided for in subsection (a) of . section. After such <br />hearing the city administrator or designee may affirm the notice, , "the notice or quash <br />the notice. (, <br />(d) If the property owner does not abate the nuisance as r <br />for in subsection (a) of this section and has not requested <br />administrator or designee under subsection (b) of this <br />shall abate the nuisance. The cost of such abatem <br />assessment against the property upon which the <br />(e) If the property owner requests a hearing <br />subsection (b) of this section, no abatement actions <br />after the hearing the city administrator or designee af <br />nuisance is not abated as provided in tice as affirm <br />of the city shall abate the nuisance. The ch abateme <br />assessment against the property upon w ce was I <br />(f) Nothing in this section prevents abate <br />notice and hearing in the an emerge <br />threat to the public he . The expe <br />collected as a spe . st the p <br /> <br /> <br />rm Water Management <br /> <br />ly with the State's goal of obtaining a pollutant <br />at 'de, at minimum, changes in Average Annual Flow <br />s, . hosphorus. This modeling will be based on two time <br />) to 1:b.e present (2000-2005), and from the present to 2020 or <br />er will occur first. <br /> <br />(a) reducing the need for storm water management performance <br />standards by incorpo ~ g the use of natural topography and land cover. It shall also: <br />1. Minimize impact to significant natural features. <br />2. Review the site for wetlands, wooded areas of siguificance, rare and endangered <br />species habitat, areas designated by the County Biological Survey (1993), and/or Elk <br />River Natural Resource Inventory (NRI) (December 2004). These areas should not be)developed. <br />3. Minimize impervious surface coverage to the maximum extent practicable. <br />4. In designated shoreland areas the development shall meet the impervious surface <br />requirements of the Shoreland Ordinance regardless of conveyance systems. <br /> <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.