Laserfiche WebLink
<br />--- <br /> <br /> <br />MEMORANDUM <br /> <br />TO: Lori Johnson, City Administrator <br /> <br />FROM: Terry Maurer, City Engineer <br />DATE: March 23, 2007 ,~ <br /> <br />SUBJECT: Storm Sewer Installation <br />Hillside Holdings, Inc. Invoice <br /> <br />Attached is a bill from Hillside Holdings, Inc. (Riverside Development) for storm sewer that <br />we had them install last year, relative to the late fall flooding and discussion about emergency <br />overflows where none currently exist. The bill covers two locations; the first is a storm <br />sewer pipe out of a pond with no outlet in Hillside 8m Addition, in the amount of $6,350. <br />The ability to get the outlet from this area was provided by Mr. Foster constructing an <br />emergency overflow for the area of Hillside he is currently developing. The second portion <br />of the bill is for the emergency overflow on 193nl Avenue from the Deerfield 3,d large <br />ponding area (Dan Collins' property). The total of these two items is $8,791.74. <br /> <br />Based on Council direction last fall to have this work done, I would recommend payment. <br />If you have any questions or need any additional information regarding this, please let me <br />know. <br /> <br />S:\Engineer\2007 memos\03 23 07 LJ Hillside storm sewer.doc <br />