Laserfiche WebLink
<br /> <br />INFORUAnoN <br /> <br />R S S 0 C I R TED <br />o E U E LOP E R S <br />I N C Q R P 0 R R TED <br /> <br />Tuesday, ~uly 5, 1994 <br /> <br />Mr. Steve Ach <br />City of Elk River <br />P.O. Box. 490 <br />Elk River, MN 55330 <br /> <br />RE: Elk River Crossing <br /> <br />Dear Steve: <br /> <br />The application for the above referenced project was withdrawn <br />from the city submittal process on May 24, 1994. Effective <br />immediately, we are now prepared to place the project back into <br />the submittal process. I apologize for any confusion this has <br />created over the last month. Please let me know what additional <br />items are required to begin the process. Thank you for you patience. <br /> <br />~ Sincerely, <br /> <br /> <br />Pedersen <br /> <br />EMP:dc <br />enclosure <br />.cc: Earl & Lorraine Hohlen <br />John MacGibbon <br />.Mathias Fischer <br />Ron Krank/KKE Architects <br />Greg Frank/MFR Engineers <br />Bertin Bisbee/Fredrikson Byron <br />Ken Styrlund/Witcher Construction <br /> <br />~ <br /> <br />2500 West County Road 42 Hurnsville, MN 55337 (612)894-6000 FAX (612)895-1873 <br />