<br />HDM CONSULTING ENGINEERS. PLC
<br />PROJECT NO. 226153
<br />
<br />BID TABULATION
<br />
<br />2007 STREET IMPROVEMENTS
<br />IRVINGAVENUE AREA
<br />ELK RIVER, MN
<br />
<br />
<br /> SCHEDUl.E 4.0- WATERMAIN _ ALTERNATE"
<br />105 2104.501 REMOVE WATER SERVICE PIPE LF $10.00 $90.00 $10.75 $96,75 $10.00 $90.00 $bSO.OO $5,850JXI
<br />106 2104.523 SALVAGEI-IYDRANT AND GATH VALVE EACH $500.00 $500.00 $215.00 $215,00 $791.67 $791.67 $500.00 $500,00
<br />101 2504.60 ! TEMPORARY WATERMAIN LS 1.00 $5,000.00 $5.000.00 $535.00 $535.00 $2,000.00 $2,000.00 $3,000.00 $3,000.00
<br />108 2104.603 ABANDON WA'fERMAD'.l LF 633 $5.00 $3.165.00 $3.22 $2.038.26 $2.50 $1582.50 $7.00 $4,431.110
<br />109 2504.602 REINSTALL HYDRANT AND GAlE VALVE EACH $675.00 $675.00 $1 685.00 $1685.00 $791.67 $791.67 $500.00 $500.00
<br />110 2504.602 8"GATB VALVEANDDOX EACH $1.324.00 $3,972.00 $1,355.00 $4,065.00 $1.224.58 $3.673.74 $1175.00 $3.525.00
<br />III 2504.602 CONNECf TO EXISTING W ATERMAIN EACH $688.90 $1,377.80 $268.00 $536.00 $1,159.75 $2,319.50 $850.00 $1,700.00
<br />112 2504,602 WATER SERVICE CONNECfION EACH $229.53 $459.06 $460.00 $920.00 $983.31 $1,966.74 $643.00 $1.286.00
<br />IJ3 2504.603 I" COPPER TYPE K LF $18.99 $170.91 $36.45 $328.05 $16.70 $150.30 $36.35 $327.15
<br />114 2504.603 6" WATERMAIN DIPCL52 IF 15 $26.79 $401.85 $46.10 $691.50 $24.18 $362.70 $34.23 $513.45
<br />115 2504.603 8" WATBRMAIN DIPCL52 IF 605 $30.19 $18,264.95 $38.S5 $23322.75 . $26.47 $16,UI4.35 $31.74 $19,202.70
<br />116 2504,608 DUcrn..E IRON FfITlNGS LB 311 $3,44 $1 069.84 $2.15 $668.65 $3.82 1188.02 $3.05 948.55
<br />117 SPEC STANDARD PROcroR rrn.ENCH) EACH $101.44 $101.44 1100.00 $100,00 $105.00 $105.00 193.00 $93.00
<br />118 SPEC INPLACE DENSITY & MOISTURE (TRENCH) EACH $35.50 $71.00 $27.50 $55.00 $36,75 $73.50 $26.00 $52.00
<br />'1' SCHEDULE4.0_ WATERMAIN -TOTAL $35,318.85 $35,256.96 $31,109.69 $41,928.85
<br /> DASE BID SUMMARY
<br /> SCHEDULE 1.0 - STREET _ TOTAL $1,220,527.58 $1,271,282.10 $1,316,650.78
<br /> SCHEDULE 1.0 - STORM - TOTAL $189,301.04 $176,024.80 $187,206.78
<br /> SCHEDULE 3.0 - W A TERMAlN _ TOTAL $187,446.00 $215.102.07 $197,915.54
<br />T BASE BID SUMMARY ~ TOTAL $1,597.280.62 $1,662.408.97
<br />'1' AL TERNA TE BID (SCHEDULE 4.01 a TOTAL $35,318,85 $35,256.96 $31,109.69 $41,928.85
<br />
<br />Highlighted numbers indicate corrections made based on bid unit prices in bid form
<br />
<br />80F 12