Laserfiche WebLink
<br /> <br />CAPX 2020 <br />INTERIM REpORT <br />DECEMBER 2004 <br /> <br />Minnesotans will require access to new generation facilities to meet projected growth. They <br />will need a robust transmission system, one that can provide service reliably into the future, <br />"'to support the new generation facilities. To meet these needs, significant transmission line <br />'_ upgrades and new transmission construction will be required over the next 15 years. CapX <br />;; 2020 understands these needs and believes planning and construction must be done wisely, <br />serving the public interest through a deliberate process that includes all stakeholders. We <br />": look forward to working with stakeholders to ensure these objectives are met. <br /> <br />CAPX 2020 VISION TEAM MEMBERS <br /> <br />Will Kaul <br />Vice President, Transmission <br />Great River Energy <br />Elk: River, Minnesota <br />\N""WW. greatn vcrenergy.com <br /> <br />Tom Ferguson <br />Vice President, Power Delivery and Transmission <br />Minnesota Power <br />Duluth, Minnesota <br /> <br />w\N'"\v.mnpower.com <br /> <br />Rod Scheel <br />Vice President, Asset Management <br />Otter Tail Power Company <br />Fergus Falls, Minnesota <br />www.otpco.com <br /> <br /> <br />Raymond 1. Wahle <br />Director, Power Supply and Operations <br />Missouri River Energy Services <br />Sioux Falls, South Dakota <br />"\Il"\vw.mrenergy.com <br /> <br />Doug Jaeger <br />Vice President, Transmission, Safety & Technical Training <br />- and Don Jones <br />Director, Transmission Asset Management <br />Xcel Energy <br />Minneapolis, .Minnesota <br />www.xcelencrgy.com <br /> <br />7 <br /> <br />!/i- <br />f <br />J <br />I <br />I <br />~Mt= <br />l <br />iW. <br />l <br />~- <br /> <br />- <br />