My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.4. SR 02-20-2007
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2007
>
02/20/2007
>
6.4. SR 02-20-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:36:46 AM
Creation date
2/16/2007 10:04:52 AM
Metadata
Fields
Template:
City Government
type
SR
date
2/20/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />'Ji'ILLER <br />CORPORATION <br /> <br />Tiller Corporation <br />and its opemting divisions <br /> <br />Corporate Office: <br />PO Box: 1480 <br />7200 Hemlock Lane, Suite 200 <br />Maple Grove, Minnesota 55311 <br /> <br />Barton Sand & Gravel Co. <br />Commercial Asphalt Co. <br />Barton Enterprises, Inc. <br /> <br />general: (763) 425-4191 <br />facsimile: (763) 425-7153 <br />web: www.tillercorp.com <br /> <br />December 26, 2006 <br /> <br />Rebecca Haug <br />Environmental Administrator <br />13065 Orono Parkway <br />Elk River, MN 55330 <br /> <br />Re: Amendment,to Existing CUP <br /> <br />Dear Ms. Haug: <br /> <br />Enclosed are application forms for amending an existing copditional use permit for <br />mining to allow for an extension of operating hours. The volume of material being <br />mined, processed and sold at the Elk River facility is expected be consistent with <br />recent past years. The only change being requested is in the operating hours for <br />mining and processing activities. <br /> <br />Tiller Corporation and its operating division Barton Sand & Gravel Co. operate <br />facilities in the city of Elk River and Livonia Township. Currently, the Elk River site <br />produces mainly washed concrete aggregates while the Livonia site produces mostly <br />bituminous aggregates. Each facility has similar crushing and processing equipment <br />and each site operates 45 to 50 hours per week (one shift) during the entire minin,g <br />season. <br /> <br />We are proposing operational changes at these facilities to increase efficiency and <br />equipment use. Instead of mining and processing with one shift at both locations for <br />the entire season, we intend mine and process for first half of the season at one <br />facility utilizing two shifts and then move the equipment an.d crews to the other <br />facility for the second half of the season. Anticipated scheduling has us starting in <br />Elk River around mid March (weather permitting) and completing the year's <br />production around mid July. We would then move to Livonia and operate until the <br />end of the season in mid to late November. Operating hours would be <br />approximately 4:00 a.m. to 10:00 p.m. (two shifts) Monday through Friday. These <br /> <br />This Company is an Equal Opportunity Employer <br />
The URL can be used to link to this page
Your browser does not support the video tag.