My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.7. PCSR 02-13-2007
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2006-2010
>
2007
>
02-13-2007
>
5.7. PCSR 02-13-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2008 4:00:09 PM
Creation date
2/13/2007 12:28:45 PM
Metadata
Fields
Template:
City Government
type
PCSR
date
2/13/2007
case
CU 07-05
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />Great River Energy <br />Elk River Station <br />Equipment Storage Garage (extension to Warehouse 2) <br /> <br />Great River Energy operates a power plant on the Elk River campus at the intersection of <br />Highways 10 and 169. This facility operates around-the-clock (24/7) and has 43 <br />employees, at least five (5) of whom are at the facility at all times. <br /> <br />As part of the plant operation, large mobile equipment (front end loaders and vacuum <br />truck) are used. To keep this equipment usable in the winter and to follow <br />manufacturer's recommendations, indoor storage of this equipment is advised. This <br />equipment is larger (height) than previous plant equipment and does not fit in any <br />existing plant buildings. . <br />:fJ I rq; 1-1 Wi s\1 <br />A ~'x 48'x J;tj' building extension is planned on the north side ofGRE Building No.2 to <br />store the large mobile equipment. The building extension will be a pole, framed building <br />with metal siding, similar to multiple other facilities on the Elk River campus. The <br />building will be heated and insulated and have two (2) 16'(h) x 14'(w) Energy Saver <br />doors and one (1) service door. <br /> <br />The area where this building will be is currently asphalted. No expected impact on the <br />site is expected. <br /> <br />. <br /> <br />DATE RECEIVED <br />! <;}- let -61.p <br /> <br />. <br /> <br />c ~ QoK <br />7(;; 7 / 1L-[{ -~015 <br /> <br />T.12 ~ <br />fJ .--ed( <br />
The URL can be used to link to this page
Your browser does not support the video tag.