Laserfiche WebLink
<br />. <br /> <br />Great River Energy <br />Elk River Station <br />Equipment Storage Garage (extension to Warehouse 2) <br /> <br />Great River Energy operates a power plant on the Elk River campus at the intersection of <br />Highways 10 and 169. This facility operates around-the-clock (24/7) and has 43 <br />employees, at least five (5) of whom are at the facility at all times. <br /> <br />As part of the plant operation, large mobile equipment (front end loaders and vacuum <br />truck) are used. To keep this equipment usable in the winter and to follow <br />manufacturer's recommendations, indoor storage of this equipment is advised. This <br />equipment is larger (height) than previous plant equipment and does not fit in any <br />existing plant buildings. . <br />.~ I rq; 1-, JV--tw- <br />A ~'x 48'x "00' building extension is planned on the north side of GRE Building No.2 to <br />store the large mobile equipment. The building extension will be a pole, framed building <br />with metal siding, similar to multiple other facilities on the Elk River campus. The <br />building will be heated and insulated and have two (2) 16'(h) x 14'(w) Energy Saver <br />doors and one (1) service door. <br /> <br />The area where this building will be is currently asphalted. No expected impact on the <br />site is expected. <br /> <br />. <br /> <br />DATE RECEIVED <br />1~-\C1-~ <br /> <br />. <br /> <br />c ~ QOJ( yJ ~J( <br />7&/'; / ?l-f { -~~ IS <br />