Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />Comment: The Planning Commission will consider your applications at their meeting on <br />January 9'h, 2007. If you would like to incorporate these comments into plan revisions, please <br />resubmit on or before January 2nd. If not, staff will recommend these statements as conditions to <br />approval. <br /> <br />Response: Representatives from UnitedHea1th Group and our design consultants will be present <br />at the January 9, 2007 Planning Commission meeting and at the following January 16, 2007 City <br />Council meeting. <br /> <br />As noted above, UnitedHea1th Group accepts the basic design conditions as outlined by the City <br />in their December 22, 2006 letter and Comments, subject to the engineering comments not yet <br />completed. Required conditions of approval will be addressed in subsequent construction <br />documents for civil engineering, landscape architecture and architectural design. <br /> <br />UnitedHealth Group and the project design team appreciate the City's comments on the <br />UnitedHea1th Group Next Technology Center submittal package. Please do not hesitate to <br />contact me (telephone: 952-936-3653 or email: dennis_spalla@uhc.com) or Eric Johnson <br />(telephone: 952-933-0972 or email: ejohnson@rlkinc.com) with any questions. <br /> <br />Sincerely, <br /> <br /> <br />~;;jU~~~ <br /> <br /> <br />Director of Real Estate Services <br />