Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br /> <br />MEMORANDUM <br /> <br />TO: <br /> <br />Sheila Cartney, Senior Planner <br /> <br />FROM: <br /> <br />Terry Maurer, City Engineer <br /> <br />DATE: December 7, 2006 <br /> <br />SUBJECT: <br /> <br />Marathon Petroleum/Super America <br />File #226-162P <br /> <br />Based on our initial review of the submittal package for the proposed Super America Store <br />to be located in Mississippi Ridge, and a meeting held yesterday with representatives of <br />Super America and their engineer, I would offer the following comments: <br /> <br />1. The driveway shown on 171 st Avenue must be eliminated. A condition on the final plat <br />was that access control be provided all along 171 st Avenue so that there would be no <br />question whether or not a driveway would be allowed. The driveway is much to close to <br />the Highway 169 intersection and provides an opportunity for vehicles to try to cross <br />three lanes of traffic to get into the left turn lane. <br /> <br />2. The site shows two construction access points. The one shown along 171 st Avenue <br />should be eliminated and if two are needed, it should be replaced near the south end of <br />the lot at the common driveway. <br /> <br />3. A cross access agreement will be needed between this lot and the lot to the south which <br />share a common driveway. It may be that the owner of the plat will prepare and sign <br />cross access agreements before the property is actually transferred. If not, it will need to <br />be signed by representatives of Super America. <br /> <br />4. Since the site is over one acre in size, a NPDES permit and a Storm Water Pollution <br />Prevention Plan (SWPPP) must be submitted, reviewed and approved. The SWPPP <br />must be in an 8 % x 11 inch format and signed by the owner, contractor and engineer. <br /> <br />5. At the conclusion of the construction of the facility, record drawings in the approved <br />City format, both electronic and paper, must be submitted prior to releasing the letter of <br />credit. <br /> <br />S:\PLANNING\Case Files\2007\CUP\CU 07-01 Super America\12 0706 Engr's memo.doc <br />