My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.2. SR 02-05-2007
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2007
>
02/05/2007
>
5.2. SR 02-05-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:36:46 AM
Creation date
2/2/2007 10:57:32 AM
Metadata
Fields
Template:
City Government
type
SR
date
2/5/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />would require some grading of the alleys, a thick gravel base, and two lifts of bituminous <br />surfacing. Otherwise, the alleys will be subject to breakup every- time a heavy truck travels down <br />them. Many of the properties that abut the alley, especially on the Irving Avenue side, do not <br />actually utilize the alley for their driveway access. I believe it would be a better approach to <br />simply re-grade the alleys and re-gravel them as a maintenance-type project without any <br />assessment to the abutting property owners. If the Council would like, this work could be <br />accomplished by the contractor for the street reconstruction project. <br /> <br />At the close of the public hearing, it would be appropriate for the Council to consider four <br />resolutions: The first orders the improvement and the preparation of plans and specifications, the <br />second approves the plans and specifications and orders the advertisement for bids. This will <br />allow the project to bid prior to the assessment hearing. The third determines the amount to be <br />assessed and orders the preparation of the assessment roll, and the last resolution sets the <br />assessment hearing for Apri14, 2007. <br /> <br />Financial Impact <br />Based on the feasibility study which includes the cost of the alley construction, the amount to be <br />funded by the City is approximately $2.1 million out of a $3.4 million project. <br /> <br />Attachments <br /> <br />· Resolution Ordering the Improvement and Preparation of Plans and Specifications <br />· Resolution Approving the Plan/Specifications and Ordering the Advertisement for Bids <br />· Resolution Determining the Assessment Cost and Ordering the Preparation of the <br />Assessment Roll <br />. Resolution Establishing the Date for the Assessment Hearing <br /> <br />Action Requested <br />At the close of the public hearing, the Council is requested to take action on the four resolutions <br />included in the packet. <br /> <br />Council Action <br /> <br />Motion by _ <br /> <br />Second by _ <br /> <br />Vote <br /> <br />Follow Up <br /> <br />S:\EngineerImprovProj\2007 Improvement Projects \Irving Ave Area \02 05 07 CC memo.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.