Laserfiche WebLink
<br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br /> <br /> <br /> <br />;r.- ~ <br /> <br />r 'ProjecrExperience/pesig n Exo m pies <br /> <br /> <br />Hamline University, Klas Stadium & Event Center <br />· Saint Paul, Minnesota <br /> <br />Completion date: 2004 <br />. Total square footage: 23,500 sJ. <br />Total overall costs: $7.1 million <br />Construction time frame: September 2003 - August 2004 <br />Project designer: BWBR Architects <br />Project manager: Steve Erickson <br />Principal in charge: Terry Anderson <br /> <br />This new four-level sports and community gathering building integrates <br />athletics, academics, and events. <br /> <br />The multi-purpose center replaces Norton Stadium, built in 1922, with a <br />new 2,000-seat stadium and press box on the building's north side facing <br />the football field and track. <br /> <br />A four-story glass facade and entry, including a plaza-level cafe with casual <br />seating, a fireplace, and a space with interactive displays on Hamline's history, <br />grace the building's south side. <br /> <br />The second level includes flexible meeting rooms, classrooms and offices, while <br />the third level accommodates a 4,000 sJ. events hall. Locker rooms, coaches' <br />offices, athletic training facilities and storage are located on the basement level. <br /> <br />Proposal for Architectural and Engineering Services [ Elk River YMCA ~ January 2007 ~ 25 <br /> <br />/~ <br />BWBR <br />~'7 <br />