Laserfiche WebLink
<br /> <br />~... ~ <br />.~............ ~~ <br />...x1~~ i l~ <br />.' ~-- <br />, -..-- <br /> <br />. ) <br /> <br /> <br /> <br /> <br /> <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br /> <br />Red Wing Family YMCA Expansion/Renovation <br />· Red Wing, MN <br /> <br />. <br /> <br />Completion date: 2002 <br />Total square footage: 64,000 sJ. (44,000 s.f. renovation; <br />20,000 s.f. addition) <br />Total overall costs: $5.4 million <br />Construction time frame: May 2001 - January 2002 <br />Project designer: BWBR Architects <br />Project manager: Greg Fenton <br />Principal in charge: Steve Patrick <br /> <br />. <br /> <br />. <br /> <br />BWBR initially completed an expansion feasibility study for Red Wing's <br />existing downtown YMCA facility in 1999. We then went on to fully <br />develop the design and oversee construction. <br />Program highlights include an expanded aquatics program, including <br />a zero-depth pool with features, dedicated teen space for young adult <br />activities, and reorganization of existing spaces for more flexible <br />programming and staffing. <br />A two-level addition to the building's former rear accommodates the new pool, <br />and is planned for future vertical expansion to add a third-floor fitness center. <br />The pool addition is also the nearest portion of the building to the river, <br />offering views of this popular outdoor water recreation venue from Red Wing's <br />newest indoor water recreation spot. <br /> <br />< <br />.. <br /> <br />· Conservation improvements include high-efficiency lighting, heating, and <br />cooling, windows and motors plus pool-area dehumidification systems with <br />heat recovery. <br /> <br />12! Proposol for Architectural and Engineering Services 1 Elk River YMCA! January 2007 <br />