Laserfiche WebLink
<br />RESOLUTION 07- <br /> <br />A RESOLUTION FOR THE CITY OF ELK RIVER <br /> <br />A RESOLUTION ORDERING THE IMPROVEMENT AND <br />PREPARATION OF PLANS AND SPECIFICATIONS IN <br />THE MATTER OF THE DEERFIELD 3RD ADDITION STREET /STORM DRAINAGE <br />RECONSTRUCTION IMPROVEMENT OF 2007 <br /> <br />WHEREAS a public hearing relating to the Deerfield 3rd Addition Street/Stonn Drainage Reconstruction <br />improvement was held before the Elk River City Council after ten days mailed notice and <br />two weeks published notice of the hearing was given; and <br /> <br />WHEREAS the City Council has duly considered the Feasibility Report and those matter presented at the <br />public hearing by those person desiring to be heard on the matter; <br /> <br />NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Elk River, Minnesota: <br /> <br />1. The Deerfield 3rd Addition Street/Storm Drainage Reconstruction improvement is hereby ordered as <br />recommended in the Feasibility Report dated December 2006. <br /> <br />2. Teny J. Maurer, City Engineer, is hereby designated as Project Engineer for this improvement. The <br />Project Engineer is directed to prepare plans and specifications for the making of the improvement <br />and the solicitation of competitive bids. <br /> <br />Passed and adopted this 16th day of January, 2007. <br /> <br />Stephanie A. Klinzing, Mayor <br /> <br />ATTEST: <br /> <br />Tina Allard, City Clerk <br /> <br />S:\EngineerImprovProj\2007 Improvement Projects\Deerfield 3rd St-Storm Drainage\Res Ord Imp Prep P&S.doc <br />