My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.2. SR 12-18-2006
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2006
>
12/18/2006
>
7.2. SR 12-18-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:36:43 AM
Creation date
12/15/2006 1:56:37 PM
Metadata
Fields
Template:
City Government
type
SR
date
12/18/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />14091591h Ave NE <br />Phone 763-434-9237 WWW.SwedeBro.Com <br /> <br />Ham Lake, MN 55304 <br />Fax 763-434-8999 <br /> <br />Customer: City of Elk River <br />Jeffrey Beahen <br />13077 Orono Parkway <br />Elk River, MN 55330 <br /> <br />Date: 9/8/06 <br /> <br />RE: Police Station Garage Floor-OPTIONS <br /> <br />Description: <br /> <br />Option 1 - Sallv Port - Police Station <br />Polyurethane System <br />- Shot~blast concrete for profile and correct bond. <br />- Clean and prepare concrete for resurfacing. <br />- Apply BR-ll0 100% solids epoxy primer. <br />_ Apply thick squeegee coat of BR~330 100% solids epoxy in a color to be determined. <br />Broadcast silica sand and/or aluminum oxide for skid resistance. <br />- Apply two top coats of BR-440 clear aliphatic pOlyurethane.......................add$1,210.00 <br /> <br />Option 2 - Evidence Receivina Room - Police Station <br />- Grind to remove existing coating and profile concrete. <br />_ Apply thick squeegee coat of BR~330 100% solids epoxy in a color to be determined. <br />Broadcast silica sand and/or aluminum oxide for skid resistance. <br />- Apply one top coats of BR-440 clear aliphatic polyurethane..........................add$540.00 <br /> <br />Deposit Required - 500/0 <br />Non-Refundable <br /> <br />$ <br />$ <br /> <br />Colors and Textures will vary from any color charts or <br />samples shown. Existing expansion joints covered during <br />process may be re-cut; cracks in base' substrate may <br />reoccur. <br /> <br />Total Price <br /> <br />*Custom samples available for an additional fee. * <br /> <br />BALANCE DUE <br /> <br />$ <br /> <br />To accept this bid: Sign and return the original copy of <br />this document along with the required deposit, and other <br />forms to schedule your installation. <br /> <br />Contract subject to terms/conditions listed. Balances are due upon completion. After 30 days, a late fee is assessed. Unpaid balances are <br />assessed a ) .5% (18% APR) finance charge per month after 30 days. A Mechanic's Lien may be filed on any unpaid balances "after 30 days. ' <br /> <br />Buyer's Signature <br /> <br />Date <br /> <br />Price quote is valid/or 60 days <br />
The URL can be used to link to this page
Your browser does not support the video tag.