Laserfiche WebLink
<br />INDEPENDENT TESTING TECHNOLOGIES, INC. <br />PROJECT: 06-507B CITY OF ELK RIVER DATE: 11-9-06 <br />DEERFIELD, 3RD ADDmON . START TIME: 12:14 <br />2007 RECONSTRUCTION PROJECTS <br />ELK RIVER, MINNESOTA <br />LOCA lION: 190th Ct NW <br /> <br /> <br />Boring complete to 4 feet. <br />No water was encountered during drilling. <br /> <br />. Sample <br /># <br /> <br /> <br />LOG OF SOIL BORING <br />BORING #:8-21 <br />END TIME: 12:19 <br /> <br />METHOD: 31/4" 1.0. Hollow Stem Auger <br />CREW: ED /NF <br />ELEVATION: NOT AVAILABLE <br />N Water <br />Value Table <br /> <br /> <br />Notes <br /> <br />NMC = 10.00/0 <br />10 %<#200 = 29.2% <br />