Laserfiche WebLink
<br />INDEPENDENT TESTING TECHNOLOGIES, INC. <br />PROJECT: 06-507B CITY OF ELK RIVER <br />DEERFIELD, 3RD ADDmON <br />2007 RECONSTRUCTION PROJECTS <br />ELK RIVER, MINNESOTA <br />LOCA 710N: Zane Street Northwest <br /> <br /> <br />Boring complete to 4 feet. <br />No water was encountered during drilling. <br /> <br />Sample <br /># <br /> <br /> <br />LOG OF SOIL BORING <br />DATE: 11-1-06 BORING #:B-4 <br />START TIME: 1:20 END 71ME: 1:26 <br /> <br />METHOD: 31/4" 1.0. Hollow Stem Auger <br />CREW: ED/NF <br />ELEVATION: NOT AVAILABLE <br />N Water <br />Value Table <br /> <br /> <br />Notes <br /> <br />7 <br />