My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1.B. SR 12-18-2006
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2006
>
12/18/2006
>
6.1.B. SR 12-18-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:36:43 AM
Creation date
12/15/2006 1:43:09 PM
Metadata
Fields
Template:
City Government
type
SR
date
12/18/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br /> <br />GEOTEC~CALEXPLORATIONS <br />CITY OF ELK RIVER <br />2007 STREET RECONSTRUCTION <br />DEERFIELD 3rd ADDITION IMPROVEMENTS <br />ELK RIVER, MINNESOTA <br />PROJECT 06-507B <br /> <br />A. Introduction <br /> <br />This report is being prepared for use by our client on this specific project. We intend to <br />present this report and our findings in the same logical manner that led us to arrivejiour <br />recommendations. This report is based on some general assumptions regarding the <br />anticipated construction based on experience with similar projects. ~h~~, assu~pti()I:lS _ ~~,~ <br />ffie- entiie- report sliould-b-e-reviewecfbiimedlateiy uponrecelpt.'- -- " <br /> <br />Purpose: <br />The purpose of our investigation was to evaluate the existing soil and water conditions on <br />this site for the purpose of reconstructing several residential streets throughout the City of <br />Elk River. The project will consist of bituminous street reconstruction with curb and gutter <br />and some storm sewer improvements. Some water main will also be replaced. In <br />accordance with your 'written authorization, we have conducted a subsurface exploration <br />program for the proposed proj ect. <br /> <br />Scope of Services: <br />Our authorized scope of services included the following: <br />1. To investigate the subsurface soil and water conditions encountered at <br />nventy-two (22) split-spoon soil boring locations. The boring depths were <br />planned to be 4 to 10 feet at each location. The approximate locations are <br />shown on the boring location plan in Appendix 1. <br /> <br />Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.