My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INFORMATION #2 12-04-2006
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2006
>
12/04/2006
>
INFORMATION #2 12-04-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:36:42 AM
Creation date
11/30/2006 4:21:09 PM
Metadata
Fields
Template:
City Government
type
SR
date
12/4/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Page 3 <br />Regular meeting ofthe Elk River Municipal Utilities Commission <br />November 14, 2006 <br /> <br />The $143,000 difference from item 5.2 would allocate half ($70,000) in rate reduction for <br />these customers. Staffwill complete the changes and present it at the December meeting for <br />approval. <br /> <br />5.5 Review & Consider Data Center Service A2reement <br />The Electric Service Agreement for the United Health Group Data Center was reviewed. <br />Staff recommends approving this agreement so Elk River Municipal Utilities can move <br />forward with our phase of the project, which includes engineering for the new electric feeder, <br />engineering for the additional substation, and material procurement. United Health Group will <br />sign the agreement on November 21,2006. <br /> <br />Motion by John Dietz to allow Jerry Takle and Bryan Adams execute the contract with United <br />Health Group once the agreements are signed on November 21 st. James Tralle seconded the <br />motion. Motion carried 3-0. <br /> <br />6.1 Review & Consider Bid Tabulation for 69kv Transformer <br />On October 26, 2006, bids were received for a new 69kv transformer. This transformer <br />will be incorporated into the new Waco Substation that will serve among other entities, the <br />new United Health Group Data Center. Staff recommends award be given to the lowest <br />responsive bidder, Virginia Transformer Corp. <br /> <br />Motion by James Tralle to award the 69kv transformer to Virginia Transformer, the lowest <br />responsive bidder at the price not to exceed. John Dietz seconded the motion. Motion carried <br />3-0. <br /> <br />6.2 Review & Consider Bid Tabulation for Twin Lakes Watermain <br />At the August 22, 2006, Elk River Municipal Utilities Commission meeting, <br />authorization was given to prepare plan specifications and secure bids for two watermain <br />projects along Twin Lakes Road. <br />The first is from Trott Brook South to 175th Avenue booster station which will loop the <br />watermain for the Johnson Street water tower. Bids were received on October 31,2006. <br />The second project was to construct a watermain from Water Treatment Plant #7 to County <br />Road 12. This project would reduce system pressures so both Wells #7 and #8 could be <br />operated together. Part way through the engineering phase, it became obvious this would be <br />an expensive project and well above our initial estimates. This project will eventually be <br />required, but in the short term we can adjust some control valves at Water Treatment Plant #7 <br />to reduce pressure when the pumps start at Wells #7 and #8. When we construct the Well in <br />Twin Lakes Estates, this watermain will be constructed. Bid tabulations were reviewed for the <br />Trott Brook South to 175th Avenue watermain project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.