My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.2. SR 12-04-2006
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2006
>
12/04/2006
>
6.2. SR 12-04-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:36:42 AM
Creation date
11/30/2006 4:06:18 PM
Metadata
Fields
Template:
City Government
type
SR
date
12/4/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />City of Elk River <br />REQUEST FOR COUNCIL ACTION <br />Agenda Section Meeting Date <br />Communi Develo ment December 4, 2006 <br />Item Description <br />Gateway Business Park planning budget and work plan <br /> <br /> <br />Item Number <br />6.2. <br />Prepared by <br />erem Barnhart, Plannin <br />Reviewed by <br />Scott Clark, Community Development <br />Director <br /> <br /> <br />Attachments <br /> <br />. Work Plan, dated November 29, 2006 <br />. Maxfield Research, Inc proposal <br />. McComb Group, Ltd proposal <br /> <br />Introduction <br /> <br />The Council is asked to approve the budget for the Gateway Business Park-planning, authorize the <br />contract to complete the market study, and authorize the City Engineer to complete preliminary <br />engineering work to prepare for platting and construction documents. <br /> <br />Discussion <br /> <br />After Council direction, Staff developed a work plan to outline the planning process for the Gateway <br />Business Park. On September 7th, 2006, this plan was approved by the Economic Development Authority <br />(EDA). At this same time, it was determined that the EDA will sevre as the 'agent' for the Council in <br />terms of providing future direction, while at the end of the process the City Council will be asked to <br />formally approve the plan. <br /> <br />A Market study was included in the work plan to better identify the market opportunities for the <br />property, and to guide the design of the plat. To date, Staff has received two quotes for the completion <br />of this study: Maxfield Research, Inc ($29,500), McComb Group, Ltd ($53,000). Copies of the proposals <br />are attached. <br /> <br />Additionally, authorization to begin preliminary engineering work is suggested. The City Engineer will <br />begin the process to determine sanitary sewer and water pipe size and depth, determine feasibility of <br />servicing the Youth Area Complex and the Commercial Reserve area on US 10, storm water needs, etc. <br />No report will be generated, but this information will allow for a running start toward completion of <br />more detailed plans once the land use pattern has been established. <br /> <br />Lasdy, an updated version of the work plan is attached for the Council's information. The planned <br />opening date for the park remains Summer 2008, with marketing to start in earnest Summer 2007. <br /> <br />C\Documents and Settings\jbamhart\Desktop\Request for Council action 12-4-06.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.