My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.8. & 7.9. SR 06-27-1994
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1994
>
06/27/1994
>
7.8. & 7.9. SR 06-27-1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:36:40 AM
Creation date
10/20/2006 2:25:33 PM
Metadata
Fields
Template:
City Government
type
SR
date
6/27/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />e <br /> <br />e <br /> <br />e <br /> <br />. <br /> <br />The trunk sanitary sewer and water are proposed to stop at the east edge of the <br />County Administration property. However, a corridor should be acquired to <br />facilitate the extension westerly of these utilities in the future to serve the <br />remainder of the Western Area. This corridor should be from east to west across <br />the County Administration property and should be a minimum of 60 feet in width. <br /> <br />IX, COST <br /> <br />The estimated costs for the improvements discussed in this report are presented in Tables <br />1-4. Table 5 shows a summary of all the costs listed in Tables 1-4. The total project cost <br />includes the estimated construction cost plus 28 percent for overhead, which includes City <br />administration, engineering, fiscal, and legal costs. No costs have been included for the <br />acquisition of right-of-ways, utility or drainage easements. <br /> <br />TABLE 1. <br />SANITARY SEWER IMPROVEMENT COST SUMMARY <br /> <br />Estimated Trunk Sanitary Sewer Improvements <br />Estimated Sanitary Sewer Improvements for Joplin Street <br />and the County Administration Building <br />Estimated Sanitary Sewer Improvements for Sandpiper Estates <br />Estimated Total Construction Cost <br />Administration, Engineering, Fiscal, & Legal <br /> <br />$209,000 <br /> <br />102,800 <br />95,000 <br />$406,800 <br />1 11,900 <br /> <br />ESTIMATED TOTAL PROJECT COST <br /> <br />$520,700 <br /> <br />TABLE 2. <br />W ATERMAIN IMPROVEMENT COST SUMMARY <br /> <br />Estimated Trunk Watermain Improvements <br />Estimated Watermain Improvements for Joplin Street <br />and the County Administration Building <br />Estimated Watermain Improvements for Sandpiper Estates <br />Estimated Total Construction Cost <br />Administration, Engineering,Fiscal, & Legal <br /> <br />$141,300 <br /> <br />114,200 <br />107}000 <br />$362,500 <br />101,"i00 <br /> <br />ESTIMATED TOTAL PROJECT COST <br /> <br />$464,000 <br /> <br />FEAS-230.223 <br /> <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.