Laserfiche WebLink
<br /> <br />. <br /> <br />Mr. Steve Ach <br />May 13, 1994 <br />Page Two <br /> <br />from Main Street which would have served the house proposed to be removed from <br />the site. The existing house should also have had a 6-inch sanitary sewer service <br />which would be available for the new office building. <br /> <br />3. Consideration should be given to the timing of a future upgrade of Freeport A venue. <br />The street is substandard in width and its street section currently does not have <br />concrete curb or gutter. It is unlikely that the two adjacent commercial buildings <br />would petition for a new street. It is more likely that an upgrading of Freeport <br />A venue would have to be initiated by the City Council. It may be appropriate to <br />program for such an improvement in the foreseeable future. <br /> <br />4. This site should be assessed the $600/acre storm sewer impact fee. <br /> <br />5. Consideration should also be given to assessing this property for trunk sanitary sewer <br />and water, since in its residential use it was never assessed for those facilities. <br /> <br />6. <br /> <br />Glenn Sundeen from the Elk River Municipal Utilities indicates that he would need <br />a lO-foot wide easement around the perimeter of the property to facilitate electrical <br />service. <br /> <br />e <br /> <br />If you have any questions or would like additional information, please call. <br /> <br />Sincerel y , <br /> <br />MSA, CONSULTING ENGINEERS <br /> <br />~JIII~ <br /> <br />Terry 1. Maurer, P.E. <br /> <br />TJM:tw <br /> <br />230-1305.may <br /> <br />. <br />