Laserfiche WebLink
<br />Item Estimated Unit Total <br />No. Description Unit Quantity Price Price <br /> GRADING AND EROSION CONTROL <br />I Clearing & Grubbing ACRE 0.6 $10,000.00 $6,000.00 <br />2 Remove Existing Creek Crossing (Culvert Pipe and Road Bed) L.S. 1.0 $3,000.00 $3,000.00 <br />3 Common Excavation(EY) (P) C.Y. 15,610.0 $1.60 $24,976.00 <br />4 Subgrade Excavation (EV) (P) C.Y. 8,090.0 $1.60 $12,944.00 <br />5 Subgrade Correction (EV) (Allowance) C.Y. 8,000.0 $1. 75 $14,000.00 <br />6 Excavate & Recompact Existing Fill on Lots I & 2, Block 2 (EY) (Allowance) C.Y. 6,250.0 $1.60 $10,000.00 <br />7 Excavate and Place Material From Stockpiles to Balance Site Grading (EV) c.Y. 1,790.0 $1.60 $2,864.00 <br />8 Silt Fence (type regular) L.F. 2,102.0 $1.30 $2,732.60 <br />9 Silt Fence (type heavy duty) L.F. 1,109.0 $2.05 $2,273.45 <br />10 Rock Construction Entrance Inc. Maint. EACH 1.0 $1,250.00 $1,250.00 <br />11 Seeding & Mulching MNDOT 50B ACRE 6.4 $500.00 $3,200.00 <br />12 Seeding & Mulching MNDOT 325 (p) ACRE 0.6 $1,350.00 $810.00 <br />13 Re-spread Topsoil (P) c.Y. 3,170.0 $3.00 $9,510.00 <br />14 Wood Fiber Blanket S.Y. 1,825.0 $ 1.25 $2,281.25 <br />15 Remove/Dispose of Silt Fence (all types: L.F. 3,211.0 $0.65 $2,087.15 <br /> Subtotal Grading and Erosion Control $97,928.45 <br /> SANITARY SEWER <br />1 Remove Plug & Connect to Existing Sanitary Sewer EACH 1.0 $3,500.00 $3,500.00 <br />2 8" PVC SDR 35 Sanitary Sewer (10'-12' Depth) L.F. 72.0 $22.00 $1,584.00 <br />3 8" PVC SDR 35 Sanitary Sewer (12'-14' Depth) L.F. 163.0 $28.00 $4,564.00 <br />4 8" PVC SDR 35 Sanitary Sewer (14'-16' Depth) L.F. 56.0 $32.00 $1,792.00 <br />5 8" PVC SDR 26 Sanitary Sewer (14'-16' Depth) L.F. 82.0 $38.00 $3,1 16.00 <br />6 8" PVC SDR 26 Sanitary Sewer (16'-18' Depth) L.F. 244.0 $38.00 $9,272.00 <br />7 Standard 48" Diameter Manhole (0-8' Depth) EACH 3.0 $2,000.00 $6,000.00 <br />8 Extra Depth 48" Diameter Manhole V.F. 17.4 $100.00 $1,740.00 <br />9 4" x 8" PVC SDR 26 Wye EACH 11.0 $75.00 $825.00 <br />10 4" PVC SDR 26 Riser Pipe V.F. 5.0 $14.00 $70.00 <br />11 4" PVC SDR 26 Sanitary Sewer Service Pipe (Horizontal) L.F. 596.0 $12.00 $7,152.00 <br />12 4" PVC SDR 26 Bend EACH 13.0 $25.00 $325.00 <br />13 4" PVC SDR 26 Plug EACH 11.0 $25.00 $275.00 <br />14 Trench Stabilization Aggregate (500#/L.F.) TON 154.0 $26.00 $4,004.00 <br />15 Televise Sanitary Sewer L.F. 617.0 $2.50 $1,542.50 <br /> Subtotal Sanitary Sewer $45,761.50 <br /> WATER MAIN <br />I Remove Plug and Connect to Existing Water Main EACH 1.0 $3,000.00 $3,000.00 <br />2 6" DIP Class 52 Water Main (All Depths) L.F. 28.0 $22.00 $616.00. <br />3 8" DIP Class 52 Water Main (All Depths) L.F. 755.0 $25.00 $18,875.00 <br />4 Hydrant with Auxiliary Valve EACH 2.0 $2,800.00 $5,600.00 <br />5 8" Gate Valve & Box EACH 2.0 $1,300.00 $2,600.00 <br />6 Fittings (Ductile Iron C-153) LB. 510.0 $3.50 $1,785.00 <br />7 1" Corporation Stop with Saddle EACH 11.0 $100.00 $1,100.00 <br />8 1" Copper Water Service (Horizontal) L.F. 577.0 $16.00 $9,232.00 <br />9 1" Curb Stop with Box EACH 11.0 $135.00 $1,485.00 <br />10 Install 8" DIP Plug EACH 1.0 $100.00 $100.00 <br /> Subtotal Water Main $44,393.00 <br /> <br />Page 1 <br />