My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.4. SR 06-20-1994
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1994
>
06/20/1994
>
5.4. SR 06-20-1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:36:38 AM
Creation date
10/10/2006 3:39:26 PM
Metadata
Fields
Template:
City Government
type
SR
date
6/20/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />FINAL PAYMENT ESTIMATE <br /> <br />NO. 2 <br /> <br />. <br /> <br />FROM: NOVEMBER 27, 1993 <br />TO: MAY 20, 1994 <br /> <br />CONTRACTOR: LANDMARK CONCRETE, INC. <br />ADDRESS: 17630 HIGHWAY 65, HAM LAKE. MN 55304 <br />OWNER: CITY OF ELK RIVER, MINNESOTA <br />PROJECT: 1993 JACKSON AVENUE SIDEWALK IMPROVEMENTS (230-175-30) <br /> <br />COMPLETION DATE <br />ORIGINAL: 21 DAYS <br />REVISED: <br /> <br />AMOUNT OF CONTRACT: <br />ORIGINAL $ <br />REVISED $ <br /> <br />21,133.50 <br /> <br /> <br /> SCHEDULE 1.0 SIDEWALK CONSTRUCTION <br />1 4" CONCRETE SIDEWALK SF 5000 1.87 0.00 0.00 4,584.00 8,572.08 <br />2 2" BITUMINOUS SIDEWALK SF 5310 1.05 0.00 0.00 4,747.00 4,984.35 <br />3 CLASS 5 AGGREGATE BASE TON 140 8.48 0.00 0.00 143.00 1,212.64 <br />4 12" CMP CULVERT LF 60 11.68 0.00 0.00 0.00 0.00 <br />5 12" CMP APRONS EA 2 70.00 0.00 0.00 0.00 0.00 <br />6 SOD WITH TOPSOIL SY 2000 2.09 0.00 0.00 0.00 0.00 <br />e SCHEDULE 1.0 SIDEWALK CONSTRUCTION-TOTAL 0.00 14,769.07 <br /> TOTAL AMOUNT THIS PERIOD 0.00 <br /> TOTAL AMOUNT TO DATE 14,769.07 <br /> DESCRIPTION TOTAL THIS PERIOD TOTAL TO DATE <br /> SCHEDULE 1.0 SIDEWALK CONSTRUCTION-TOTAL 0.00 14,769.07 <br /> <br />e <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.