My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.2. SR 05-31-1994
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1994
>
05/31/1994 - SPECIAL
>
7.2. SR 05-31-1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:36:37 AM
Creation date
10/10/2006 2:52:03 PM
Metadata
Fields
Template:
City Government
type
SR
date
5/31/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />e <br /> <br />Ms'~ <br /> <br />CONSULTING ENGINEERS <br /> <br />CIVil ENGINEERING: <br /> <br />ENVIRONMENTAl <br /> <br />MUNICIPAl <br /> <br />PLANNING <br /> <br />STRUCTURAl <br /> <br />e <br /> <br />SURVEYING <br /> <br />TRAFFIC <br /> <br />TRANSPORT A nON <br /> <br />1326 Energy Park Drive <br />51. Paul, MN 55108 <br />612-644-4389 <br />Fax: 612-644-9446 <br /> <br />e 9800 Shelard Parkway <br />Minneapolis, MN 55441 <br />612-546-0432 <br />Fax: 612-544-6398 . <br /> <br />ITEM 7.2. <br /> <br />May 26, 1994 <br />File: 230-216-20 <br /> <br />Honorable Mayor and City Council <br />City of Elk River <br />13065 Orono Parkway <br />Elk River, MN 55330 <br /> <br />RE: EXTERNAL/INTERNAL STREET IMPROVEMENTS <br />ELK PARK CENTER <br /> <br />Dear Council Members: <br /> <br />We have tabulated the bids opened on Wednesday, May 18, 1994, at 10:00 a.m. for the <br />internal and external street improvements associated with the Elk Park Center project. There <br />were a total of six bids received. The following table lists each of the bidders and their total <br />bid. <br /> <br />Forest Lake Contracting, Inc. <br />Bauerly Brothers, Inc. <br />Buffalo Bituminous, Inc. <br />Arcon Construction, Inc. <br />Hardrives, Inc. <br />Progressive Contractors, Inc. <br /> <br />$1,673,873.71 <br />1,781,699.61 <br />1,799,808.78 <br />1,900,896.83 <br />1,942,929.42 <br />1,934,746.67 <br /> <br />The components of the improvements contained in this project are the reconstruction of <br />School Street between Jackson Avenue and TH 169, the reconstruction of Jackson Avenue <br />from School Street to TH 169, the construction of Freeport A venue from School Street to <br />Jackson Avenue, the construction of 191st from Freeport Avenue to TH 169, the addition <br />of a left turn lane on northbound TH 169 at School Street, the construction of acceleration <br />and deceleration lanes on TH 169 at 191 st Avenue, the signalization of the School Street/ <br />Jackson Avenue intersection, the signalization of the School Street/Freeport Avenue <br />intersection, the modification to the School Street/TH 169 signal, and in addition, the turn <br />lane on TH 10 at Oxford Avenue was also included in this project. The feasibility study <br />prepared in February 1994 for the Elk Park Center project estimated the construction costs <br />for these improvements at approximately $2.27 million. The low bid received from Forest <br />Lake Contracting, Inc., is several hundred thousand dollars below this estimate. As you are <br />aware, a portion of these improvements are to be 100% financed by the Developer and <br />portions are to be partially funded by the Developer and partially by Municipal State Aid <br /> <br />230/216-2605.may <br />
The URL can be used to link to this page
Your browser does not support the video tag.