My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.0. SR 04-21-1994
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1994
>
04/21/1994
>
5.0. SR 04-21-1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:36:34 AM
Creation date
9/26/2006 3:49:37 PM
Metadata
Fields
Template:
City Government
type
SR
date
4/21/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />FROM LRRKIN HOFFMRN DRLY LINDGREN 612-8963265 <br /> <br />04.20.1994 12:48 <br /> <br />P. 5 <br /> <br />e <br /> <br />the Developer Installed Improvements within <br />twelve (12) months of the issuance of a <br />Certificate of Occupancy, the security will be <br />drawn upon and used by City to complete the <br />Developer Installed Improvements. <br /> <br />(03) ~roval of ContractQ~ - All contractor(s) selected <br />by Developer to construct and install Storm Sewer, Sanitary <br />Sewer and Watermain Improvements must be determined by City <br />to be acceptable and approved by the City Engineer in <br />writing. <br /> <br />(04) Construqtion flans - Plans and specifications for <br />construction, materials and equipment for the installation <br />of Storm Sewer, Sanitary Sewer and Watermain Improvements <br />shall be appr9ved by the City Engineer and the installation <br />of all such improvements shall be in accordance with the <br />approved plans and specifications. Such plans and <br />specifications shall be based upon such engineering <br />surveys, including soil borings and material tests, <br />determined to be necessary by the City Engineer. <br /> <br />(05) Supervision an4 City Services - Construction and <br />installation plans and activity for Developer Installed <br />Improvements shall be reviewed by and subject to the <br />supervision of the City. Developer will cause the <br />contractor(s) to furnish the City Engineer with a schedule <br />of proposed operations at least five (5) days prior to the <br />commencement of construction of Developer Installed <br />Improvements. The City Bngineer shall inspect all <br />Developer Installed Improvements during and after <br />construction for compliance with approved specifications. <br />Developer will notify the City Engineer at such times <br />during construction as the City Engineer requires for <br />inspection purposes. <br /> <br />(06) City Fees - Developer shall reimburse City for all <br />City's costs and expenses incurred for review and <br />supervision of plans and construction of Developer <br />Installed Improvements, which compensation shall be due and <br />payable to City within thirty (30) days following the <br />receipt of a statement therefor. <br /> <br />(07) ~asements - Developer shall convey to City, prior to <br />the commencement of construction on Developer Installed <br />Improvements, and at no cost to City, permanent utility <br />easements for the installation and maintenance of Developer <br />Installed Sanitary Sewer and Watermain Improvements, and <br />permanent drainage easements for the on and off-site <br />drainage areas along the southern boundary of the <br />Subdivision, as required by the City Engineer. All such <br />easements shall be in recordable form acceptable to City <br />and contain such terms and conditions as City may <br />prescribe. <br /> <br />e <br /> <br />e <br /> <br />5. <br />
The URL can be used to link to this page
Your browser does not support the video tag.