My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.4. SR 09-18-2006
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2006
>
09/18/2006
>
6.4. SR 09-18-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:36:34 AM
Creation date
9/15/2006 12:32:32 PM
Metadata
Fields
Template:
City Government
type
SR
date
9/18/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />MEMORANDUM <br /> <br />TO: Jeremy Barnhart, Planning Manager <br /> <br />FROM: <br /> <br />Terry Maurer, City Engineer ~ <br />September 5, 2006 <br /> <br />DATE: <br /> <br />SUBJECT:. Kober Excavating/3-Way Properties <br /> <br />As requested, we have reviewed the site plan for the Kober Excavating improvement to their <br />property. Based on our review and comments received at the staff review meeting, we <br />would offer the following comments: <br /> <br />1. Any improvement to the site will be required to follow the newly adopted Wetland <br />Buffer Ordinance. Generally, the ordinance requires a 25-foot setback from the wetland <br />boundary with no cut and no grading in this area. This would mean the hard surface, <br />fencing and ponding be shown on their grading plan needs to be pulled back from the <br />wetland boundary. There is also a requirement for signing of the wetland buffer area. <br /> <br />2. Given the type of use of the property and the proximity to the wetland area, it will be <br />critical that the hard surfaced area is graded to drain towards the pond and not towards <br />the wetland boundary. I would suggest that a minor amount of berming at the wetland <br />buffer be included into their site work to ensure that there will be no drainage going <br />directly into the wetland. <br /> <br />3. It is my understanding that they intend to use Class V gravel or similar type material for <br />the area indicated hard surface. I am aware of other industrial sites in the City that have <br />been allowed to use gravel surfaces for outside storage of equipment and materials. <br />However, I have not verified that the City ordinance allows this type of surfacing in the <br />zoning at the Kober site. <br /> <br />4. One of the suggestions received at the staff review meeting is that the applicant submit a <br />general list of equipment and materials that would be stored on the site. <br />
The URL can be used to link to this page
Your browser does not support the video tag.