My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.3. SR 09-18-2006
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2006
>
09/18/2006
>
6.3. SR 09-18-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:36:33 AM
Creation date
9/15/2006 10:22:21 AM
Metadata
Fields
Template:
City Government
type
SR
date
9/18/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />06., .l.' <br /> <br />elk river library, elk river minnesota <br /> <br />The proposed New Elk River Library is a 16,000 sf Library, located on Orono Parkway adjacent <br />City Hall and Safety Building, creating a Civic Campus within the city of Elk River. The new <br />library is currently registered as a LEED - NC 2.2 project, and embraces sustainable design <br />principals such as natural daylighting, a high performance mechanical and electrical systems, and <br />rainwater gardens for on site water infiltration. <br />The exterior of the building is aluminum storefront, and windows, brick and zinc panels, with <br />decorative colored glass sprinkled for areas of focus. <br />Special areas are designed with specific user groups in mind, including an enhanced children's <br />area, a teen area, a reading room, quiet study rooms, central fireplace, and future coffee shop. A <br />large multi-purpose room is available for various public events and <br />meetings. The library is placed on its site to maximize views of Orono Lake and will allow for <br />future expansion of up to 50% more square footage. <br />Along Orono, a double sided, backlit, 30 sf sign is proposed on the fireplace. A double-sided sign <br />is also proposed along the South elevation at the drop box to read, "DROP" in 8" letters. <br />The main building signage is proposed along the West elevation. This signage is to be aluminum <br />cast letters, 18" high, to read "ELK RIVER PUBLIC LIBRARY". All proposed signage is on the <br />building. <br />The proposed site is designed to provide the required 54 stalls, 8 of those required stalls are <br />shown located near the staff entry for easy after hour access for the 5-7 library staff members. <br />The building has been located within the site to provide proper orientation to maximize North and <br />South daylighting opportunities and to maintain as may of the existing trees as possible. The <br />three existing trees that will be lost with site work are being replaced with 7 trees of a similar <br />species. These existing and proposed new trees provide a significant screen to the adjacent <br />residences. <br />The service area along the South face of the building will enclose the trash and transformer and <br />are screened to the North, East and West with a masonry wall to 8', and a screen gate and fence <br />to the South. <br />The current hours of operation are Mondays and Wednesdays 10 am-8 pm, Tuesdays and <br />Thursdays 12 pm - 8 pm, Fridays 10 am - 5 pm, Saturdays 9 am 2 pm and on Sundays the <br />Library is closed. In the future, the library may have extended hours of operation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.