<br />,,(::.;":~ '::" <br />'r "'.':'''' <br /> <br />MEMORANDUM <br /> <br />From: <br /> <br />FI~ery!~pnstruction, Inc. <br /> <br />To: <br /> <br />Cathy Mehelich <br />City of Elk River <br />".~ <br /> <br />Date: <br /> <br />Tuesday~'{~eptember 12, 2006 <br /> <br />Dear Cathy, <br />I am writing.inr~~ds to the proposed re-routing of traffic on Jackson Avenue to allow <br />erection of precast concrete for the Jackson Place building, and to address construction limits, schedule <br />and staging issues. .. <br />Construction Li1l!!~: Please :find attached a sketch of the proposed temporary change in the <br />consttuction limits: Along Jackson Avenue, you'll notice that the southerly two-thirds of the <br />construction fen~'~oul~move west to provide operating space for the crane, plus the required safety <br />margin between the cran~'and the foundation wall. The northern third of the Jackson Avenue fence <br />would remain 1J19ha.pg~ as would the fence on the south, east and north sides. This design preserves <br />one-way, southboUnd tX8.:ffic on Jackson Avenue. It also preserves one handicapped parking space and <br />three regular spaces. '(P~ase note that background drawing I used to make this sketch does not show <br />the location ofth;eangl,.e4,parking spaces accurately. Though it appears that a total of :five spaces <br />>,,,,,.,","(l''\l.' <br />would be preserved, in reahty it would be four.) <br />Schedule~ The duration of the re-route would be 20 working days. This includes one day to <br />move the fence, 1 5 "day~Jor precast erection, three days for masonry and one day to move the fence <br />back to its,on,ginallocat1Qn. Our target date for commencement is October 30. We will update that <br />schedule in tile next weelc iUld hope to be able to set a finn date at our September 27 meeting with city <br />staff <br /> <br />.. ,.,1 ,.'\'f.~;,~:;'~' <br />Staging:froqlT~f~tbound Main Street, trucks would enter the site at the southeast gate and <br />wait withinthe;<:~ns~,?,&:n limits. A few trucks would be unloaded from this location. The majority, <br />however, would l>tlll~~~}Urrough the southwest gate onto Main Street, then back up into the <br />construction .area .QIlJa9'kson, adjacent to the crane. When empty, they would leave downtown via <br />i, '"\i',',,,!,O;, ,1' :, ':;"":~"<'" <br />westbound Main S~~")~d Proctor Avenue. We will provide flaggers to control traffic during these <br />operatipns. . , ''''.i;' <br /> <br />Thank YQU for''Ygtking with us as we developed this plan. <br /> <br />SinCerely, <br /> <br /> <br />Precast Crane Memo 2006-09-1] .doc <br /> <br />