My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.0. SR 04-11-1994
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1994
>
04/11/1994 - SPECIAL
>
5.0. SR 04-11-1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:36:32 AM
Creation date
8/22/2006 1:24:17 PM
Metadata
Fields
Template:
City Government
type
SR
date
4/11/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />( <br />~\./ <br /> <br /> <br />ELK RIVER lVIUNICIPAL UTILITIES <br /> <br />e <br /> <br />322 King Avenue <br />Elk River. Minnesota 55330 <br />Phone (612) 441-2020 <br /> <br />JOINT MEETING OF <br />ELK RIVER CITY COUNCIL <br />AND <br />ELK RIVER UTILITIES COMMISSION <br />APRIL 11, 1994 <br /> <br />-" <br /> <br />e <br /> <br />Distribution Construction: <br />In 1993 we added over $1,100,000 in new property consisting of a <br />new substation located at the old West site. When this station <br />comes on line in another month or so we will then have the capacity <br />to serve our entire load without anyone of our stations in <br />service. As of the end of the year we had not paid for the <br />transformer, which is an additional $210,000, so it can be seen <br />that all of the money expended last year was mostly for this <br />substation. Next year we wil~ spend about $200,000 to updgrade the <br />existing UPA sub which will get it ready for our next expansion in <br />capacity which will be in approximately 1998. <br /> <br />In addition to our substation expenditures, we spent about $600,000 <br />for distribution lines. This was mostly in new subdivisions, <br />however some of it was used to upgrade our existing lines and <br />preventative maintenance. We had no major purchases of equipment <br />last year as we extended the life of some of the older equipment <br />for an additional year. <br /> <br />We had no major accidents last year involving our personnel or high <br />voltage electricity. <br /> <br />Anoka Electric Takeover of Territorv: <br />Whereas we did take over some of ABC's territory last year, we did <br />not take any of their existing customers (with one small <br />exception). Next year we will not take any major areas of their <br />customers, however, we have a very good working relationship with <br />them, and if an unexpected area comes up which would be beneficial <br />to us to serve (rather than exchange later), they usually allow us <br />to just take it. They have been very cooperative. <br /> <br />Personnel: <br />We added a new line crew last year. This consisted of two new <br />linemen and a truck which was purchased the year before. Even with <br />the additional line crew we were forced into an overtime situation <br />last summer and fall. This is usually caused by developers not <br />closing their projects until late summer and we only have a month <br />to get all of our work done before the freeze hits and we are not <br />able to plow in the underground cable. <br /> <br />e <br />
The URL can be used to link to this page
Your browser does not support the video tag.