My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.12. SR 08-21-2006
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2006
>
08/21/2006
>
5.12. SR 08-21-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:36:31 AM
Creation date
8/18/2006 10:32:56 AM
Metadata
Fields
Template:
City Government
type
SR
date
8/21/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />relocated. The signal pole in this quadrant would also need to be relocated, along with an <br />extension to the mast arm. <br /> <br />Financial Impact <br />Simply adding the left turn arrows to the two remaining legs of the intersection is a relatively <br />simple modification. The signal mast arms would need to be slightly lengthened and new heads <br />added to facilitate the left turn arrow. All total, the estimated cost to modify the signal would be <br />approximately $35,000. In addition, there would be the cost of sealcoating and restriping Jackson <br />A venue. <br /> <br />The second option which includes adding a right turn lane to the southbound leg of the <br />intersection would have much more significant impacts to the signal system. In addition to <br />adding left turn arrows, the controller and the signal pole in the northwest quadrant would need <br />to be relocated and a more significant extension made to the mast arm. These modifications to <br />the signal system are estimated to cost approximately $75,000. In addition, more right of way <br />would need to be secured from the School District. Assuming this could be done at no cost, the <br />construction of the right turn lane is estimated at an additional $75,000. Therefore, this option, <br />which would provide for better intersection operation, has a price tag of approximately $150,000 <br />plus the cost of sealcoating and restriping of J ackson Avenue. <br /> <br />Both School Street and J ackson Avenue are eligible for the use of Municipal State Aid funds. <br /> <br />Attachments <br /> <br />. None, however graphics will be available at Monday evening's meeting to further discuss <br />this issue. <br /> <br />Action Requested <br />Discussion of the preliminary intersection analysis and direction to staff on how to proceed with <br />this issue. <br /> <br />Council Action <br /> <br />Motion by _ <br /> <br />Second by _ <br /> <br />Vote <br /> <br />Follow Up <br /> <br />S:\EngineerImprovProj\2006 Improvement Projects\School St.Jackson Intersection\08 21 06 cc memo.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.