My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.10. SR 08-21-2006
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2006
>
08/21/2006
>
5.10. SR 08-21-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:36:31 AM
Creation date
8/18/2006 10:32:31 AM
Metadata
Fields
Template:
City Government
type
SR
date
8/21/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />II. METHOD <br /> <br />The County shall cause the construction of Sherburne County Project Number S.P. 71-633-01 <br />in conformance with said plans and specifications. The County shall do the calling for all <br />bids and the acceptance of all bid proposals. <br /> <br />III. COSTS <br /> <br />The contract costs of the work, or if the work is not contracted, the cost of all labor, materials, <br />normal engineering costs and equipment rental required to complete the work, shall constitute <br />the actual "construction costs" and shall be referred to herein. <br />"Estimated costs" are good faith projections of the costs, which will be incurred for this <br />project. Actual costs may vary and those will be the costs for which the relevant parties will <br />be responsible. <br /> <br />Project construction costs are estimated at $2,421,000 (Two Million Four Hundred Twenty- <br />One Thousand Dollars). Federal funds available for the project are capped at $777,000 and <br />will be applied entirely for County costs. $1,644,000 (One Million Six Hundred Forty-Four <br />Thousand Dollars) is estimated for county funding. The County will pay the cost for all <br />roadway grading, paving, access road and driveway replacements and/or improvements, <br />intersection improvements, and drainage systems. <br /> <br />The City shall pay the entire cost of the underground trail crossing, fencing and/or other <br />safety measures installed for the trail crossing, and a small portion of the mobilization and <br />traffic control costs. The estimated total cost for the City's portion of the project is $131,000 <br />(One Hundred Thirty-One Thousand Dollars). <br /> <br />The County will provide construction staking, construction observation, and contract <br />administration for the project. The City will provide construction observation/oversight for <br />the trail crossing portion of the project. <br /> <br />Upon award of the contract, the City shall pay to the County, upon written demand by the <br />County, ninety-five percent (95%) of its portion of the cost of the project estimated at <br />$124,450 (One Hundred Twenty-Four Thousand Four Hundred Fifty Dollars). The City's <br />share of the project shall include only construction and construction engineering expense and <br />does not include any administrative expenses incurred by the County. <br /> <br />Upon final completion of the project, the City's share of the construction cost will be based <br />upon the actual construction costs. If necessary, adjustments to the initial ninety-five percent <br />(95%) charged will be made in the form of credit or additional charges to the City's share. <br />Also, the remaining five percent (50/0) of the City's portion of the construction costs shall be <br />paid. <br />
The URL can be used to link to this page
Your browser does not support the video tag.