Laserfiche WebLink
<br />II. METHOD <br /> <br />The County shall cause the construction of Sherburne County Project Number S.P. 71-596-04 <br />in conformance with said plans and specifications. The County shall do the calling for all <br />bids and the acceptance of all bid proposals. <br /> <br />III. COSTS <br /> <br />The contract costs of the work, or if the work is not contracted, the cost of all labor , materials, <br />normal engineering costs and equipment rental required to complete the work, shall constitute <br />the actual "construction costs" and shall be referred to herein. <br />"Estimated costs" are good faith projections of the costs, which will be incurred for this <br />project. Actual costs may vary and those will be the costs for which the relevant parties will <br />be responsible. <br /> <br />The estimated construction cost of the total project is $2,153,000 (Two Million One Hundred <br />Fifty- Three Thousand Dollars). Federal funds available for the project are capped at <br />$719,104, whicll will be applied entirely for County costs. Above that amount, the County <br />will pay an estimated amount of $1,433,896 (One Million Four Hundred Thirty-Three <br />Thousand Eight Hundred Ninety-Six Dollars) to cover the remainder of the County's portion <br />of the project. The County will pay the cost for all roadway grading, paving, access road and <br />driveway replacements and/or improvements, intersection improvements, and drainage <br />systems (including half (50%) of the cost of the storm sewer). <br /> <br />The City shall pay the entire cost of utilities, including any water and sanitary sewer, curb and <br />gutter, the cost of constructing any trails on or adjacent to the County's roadway easement, <br />and half (50%) of the cost of the storm sewer. The estimated total cost for the City's portion <br />of the project is $650,000 (Six Hundred Fifty Thousand Dollars). <br /> <br />The County will provide construction staking, construction observation, and contract <br />administration for the project. The City will provide construction observation/oversight for <br />the water main, sanitary sewer, and curb and gutter portions of the project. <br /> <br />Upon award of the contract, the City shall pay to the County, upon written demand by the <br />County, ninety-five percent (95%) of its portion of the cost of the project estimated at 617,500 <br />(Six Hundred Seventeen Thousand Five Hundred Dollars). The City's share of the project <br />shall include only construction and construction engineering expense and does not include <br />any administrative expenses incurred by the County. <br /> <br />Upon final completion of the project, the City's share of the construction cost will be based <br />upon the actual construction costs. If necessary, adjustments to the initial ninety-five percent <br />(95%) charged will be made in the form of credit or additional charges to the City's sllare. <br />Also, the remaining five percent (5%) of the City's portion of the construction costs shall be <br />paid. <br />