My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.4. SR 08-21-2006
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2006
>
08/21/2006
>
5.4. SR 08-21-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:36:31 AM
Creation date
8/17/2006 4:24:11 PM
Metadata
Fields
Template:
City Government
type
SR
date
8/21/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />MEMORANDUM <br /> <br />TO: Jeremy Barnhart, Planning Manager <br /> <br /><1)1\"'- <br />Terry Maurer, City Engineer /\C,' v <br />DATE: July II, 2006 <br /> <br />FROM: <br /> <br />SUBJECT: Alliance Community Church <br />File: 226-139P <br /> <br />After a preliminary review of the submittal package for the Alliance Community Church, I <br />would offer the follo"Wing general comments: <br /> <br />1. I believe it is appropriate to ask for a public right-af-way or easement for street, utility <br />and drainage purposes across the property from east to west at the 186m Avenue <br />alignment in Riverplace. At some point in the future, this area will all be developed and <br />there should be continuity between neighborhoods so that snowplows, school buses, and <br />other essential services do not have to go into each neighborhood and then back out <br />onto the frontage road, but rather, can make a trip through the neighborhoods. When <br />this road is extended across the church property, one of the access points onto 185m <br />Avenue should be closed. It would seem that the easterly access would be the most <br />likely to be closed, allowing the westerly one to be remain open which leads to the front <br />door of the church. <br /> <br />2. We have received the preliminary drainage calculations although they have not been <br />reviewed at this point. The grading plan shows a pond located at the northerly portion <br />of the site. If the pond does not have an outlet, it will need to be designed for two 100- <br />year back-to-back storms or a lO-day snowmelt, whichever is more severe. <br /> <br />3. Additional right-of-way will need to be granted along 185m Avenue. It appears that this <br />is shown on the preliminary utility plan. <br /> <br />4. As with the Riverplace development, we will require the developers of the church to <br />construct 185th Avenue along their frontage including a detached bituminous trail. <br /> <br />5. The site is proposed to be served by sanitary sewer and water from the Riverplace <br />development. Sanitary sewer is shown extended from the 186m Avenue dead end up the <br />
The URL can be used to link to this page
Your browser does not support the video tag.