Laserfiche WebLink
<br />Change Order No.1 Summary <br />WWTP Headworks Improvements <br />Elk River, :MN <br /> <br />1. Grit Chamber Relocation and Deletion of Stop Gates and RJ Pipe. <br />2. Add Floor Drain in the existing Digester Building City <br />3. New hot water heater and piping in Headworks Building <br />4. Keep Grit Pumps Operational During Bypass Operations <br />5 Door Hardware Changes <br />6. Light Fixture Changes <br />7. Grading and Handrail Credit <br />8. Bar Screen Shelter and Flow Meters <br />9. Chemical Building Sump Changes <br />10. Headwork's Building Changes <br />11. Brick Veener Changes in Headvvorks <br />12. Flow Meter Credit <br />13. Mise Changes <br />14. New outlet for Sampler <br />15. Raise Existing Light Pole to final grade <br />16. Add sidewalk and cold water hose bib <br /> <br />($6,000.00) <br />$1,812.00 <br />$4,068.00 <br />$0.00 <br />$1,400.00 <br />($2,400.00) <br />($3,000.00) <br />$8,881.00 <br />$3,920.00 <br />$8,354.00 <br />$2,000.00 <br />($1,585.00) <br />$18,872.00 <br />$350.00 <br />$2,737.00 <br />$3,194.00 <br /> <br />Total $42,603.00 <br />