Laserfiche WebLink
<br />'1/~7/b4 <br /> <br />2007 Capital Outlay (revised) <br /> <br />Priority <br /> <br />1 Grader trade <br /> <br />$100,000 I.L.O. truck purchase ($60,000 savings) <br /> <br />2 H.D. One Ton Truck <br /> <br />66,000 ( same cost as original estimate) <br /> <br />3 Pick up Truck <br /> <br />25,000 (price reduced $3750) <br /> <br />Lz 40 l) ~dump box #234 <br />~ 'S"''OQ roadside mower attachment 31,950 (same cost as original estimate) <br />I 1) \.0 ~ steel roller <br />l.Q 4 ~ 0 crack router <br /> <br />5 Skid loader trade 21000 (price reduced $11,000) <br /> <br />Total $243,950 <br /> <br />Building roof still being researched <br />